Manufacturing & Heavy Industry

Beverage, chemical, cement, steel and consumer-goods plants where running time is the profit. Continuous processes plus load-shedding mean losses that keep adding up.

Share this service WhatsApp Email

In depth

Cutting factory energy cost in Zimbabwe: motors, compressed air and drives

Industrial energy saving is often shown as a long list of unrelated measures. For a factory it is easier to see it as one problem. You have a large number of electric motors. Each motor drives a load, and each runs at some part of its capacity.

01

The unit of analysis is the motor system, not the motor

A motor is only one part of a system. The system also includes the electrical supply, the control gear, the mechanical transmission and the machine being driven. Energy is lost at every stage. The motor itself may be 90 to 96% efficient at its best operating point. But a belt drive, a gearbox, a damper that throttles a fan, or a valve that throttles a pump can lose far more.

The EMSA programme estimates that you can save between 20 and 30% of the energy used by motor systems, and that this is cost-effective. That is the equivalent of roughly a tenth of all the electricity in the world. The saving does not come from one technology. It comes from a sequence of improvements:

02

Measure before you decide

Every credible efficiency programme starts with measurement. Put loggers on the main incomers and on the main motor control centres. Run them for at least two weeks, including a full production cycle. They show the base load that runs when the plant is idle. They show the daily and weekly pattern. And they show the peaks that set the maximum-demand charge.

Many plants find that their night-time or weekend load is a large share of their daytime load. This is the cheapest saving available, because it needs no new equipment. Compressors, extraction fans and pumps are simply switched off when they are not needed.

03

Motors: size, efficiency and repair policy

A motor is most efficient when it is loaded to between roughly 60 and 100% of its rating. It also has its best power factor there. Power factor shows how much of the power you draw is actually useful. A figure of 1.00 is perfect, and motors, transformers and welders pull it down. A motor that runs at 30% load, as many oversized motors do, has a lower efficiency and a much poorer power factor. It draws reactive power.

The international standard IEC 60034-30-1 defines efficiency classes from IE1 to IE4. IEC is the International Electrotechnical Commission, which writes international standards for electrical equipment. IE3 is a high efficiency class, and IE4 is higher still. Many countries now require IE3 as the minimum for new motors.

Read the full guide: Cutting factory energy cost in Zimbabwe: motors, compressed air and drivesAlso covered: Compressed air: the most expensive utility · Variable speed drives and the cube law · Connect the measures to the three parts of the bill · The regulatory dimension

What you get

Motors, compressed air and process heat quietly waste power every shift.

Where your units go

We track load by process so you can see the waste.

Power factor and peak demand

Cut the charges that add nothing to your output.

A ranked project list

Fixes ranked by payback, so your money goes where it returns most.

Deliverables

What lands in your inbox

  • Load profile for each production line, motors and compressed air
  • A plan to fix power factor and cut maximum demand
  • Power-quality check (including harmonics) for your drives
  • A list of energy projects ranked by payback
Manufacturing plantPower-quality logging

Before the call

What to bring

Rough information is fine. This is what lets us scope and quote quickly.

  • Your last 12 months of bills
  • List of large motors, compressors and boilers
  • Shift pattern and production data
  • Single-line diagram or a photo of the main board

How we work

From first message to finished work

  1. 1

    Brief

    A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.

  2. 2

    Scope & fixed quote

    We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.

  3. 3

    Engineer & document

    We study your data, test the options and write the report or application, with every assumption stated.

  4. 4

    Hand over & support

    You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.

Questions we hear

Before you book

Will the survey stop production?

No. Most of the work is done while the plant runs normally.

What happens after I book a call?

We reply within one working day, agree a short scope and a fixed quote, and start once you approve it.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.