Selected work

What we’ve modelled. What we’re modelling next.

AVEX GRID was founded in 2025. Our portfolio is intentionally small while we build it. Below is a mix of academic case work that demonstrates technical depth, and the engagement formats we offer. We will publish client work, with permission, as projects complete.

118page MSc dissertation behind the case work
3Zimbabwean industrial cases modelled in ETAP
14switchgear locations in the arc-flash case
11.4% to 3.2%modelled drop in harmonic distortion

Case work

Three studies that show how we think

AVEX GRID was founded in 2025, so our portfolio is deliberately small. These are academic cases from the founder’s MSc dissertation. They are simulations, not client projects, and they show the depth of the engineering. We will publish client work, with written permission, as projects complete.

Case · Mining

11 kV switchroom arc-flash and protection re-coordination

A simulated mill expansion

Load-flow and short-circuit re-checked against a new 22 MVA transformer after a hypothetical capacity increase. Arc-flash incident energy modelled to IEEE 1584 at 14 switchgear locations.

  • 6 protection settings changes
  • 2 relay replacements
  • PPE category re-grade
ETAPLoad flowShort circuitIEEE 1584-2018
Case · Manufacturing

Power-quality investigation on a 33 kV beverage line

Repeated drive failures

Class A monitoring to IEC 61000-4-30 and harmonic analysis to IEEE 519 traced the fault to an upstream rectifier load on a shared 33 kV feeder. A passive harmonic filter was sized and modelled.

  • Distortion modelled down from 11.4% to 3.2%
  • Filter sized and placed
  • Compliance assessment
IEC 61000-4-30IEEE 519Harmonic filter
Case · IPP connection

Grid-code study for a 12 MWp solar plant at 33 kV

Connecting to ZETDC

Steady-state, transient and reactive-capability simulation. Voltage and frequency ride-through assessed against the 2024 Grid Code, with inverter Q-V curves.

  • 2 reactive-compensation recommendations
  • Connection study report
  • Grid Code 2024 compliance
Grid Code 2024Q-V curvesConnection study

The full dissertation

118 pages with the raw ETAP outputs, single-line diagrams, monitor logs and the academic supervisor’s assessment. Available on request under NDA: inquiries@avexgrid.com.

What we deliver

Four kinds of job, with a clear outcome each

These are the formats we deliver most often. Each one ends with a document your board, lender or regulator can read.

Format 01

Energy readiness review for a facility

Bill and demand analysis, a load-logging plan and a ranked list of savings measures, prepared so your licensed auditor or energy manager can build on it.

Format 02

Bankable feasibility for captive or IPP solar

Yield modelling (P50 and P90), cost per kWh and returns, a technical risk register and the regulatory path, written for lenders and boards.

Format 03

Arc-flash and protection coordination study

Short-circuit, protection coordination and an IEEE 1584 incident-energy study with a label set and recommendations.

Format 04

Portfolio walkthrough for multi-site operators

Sample representative sites, find the outliers and deliver a prioritised retrofit list across the portfolio.

An engineer checking a motor control centre in a plant
Plants where careful engineering pays

Best fit

The jobs that suit us best

  • Mid-sized industrial sites, 200 kVA to 10 MWWhere a careful engineering hand makes a measurable difference. Single sites or small portfolios.
  • Captive solar and IPP feasibilityWhere a lender or board needs a defensible technical and financial case. Very large projects may need specialist partners alongside us.
  • Forensic and dispute workPower-quality investigations and failure analyses, independent and written for non-engineers.
  • Owner’s engineer on captive-power buildsOn your side of an EPC contract. Best with one contractor and a clear scope.

Have a project for our next case study?

Most of our best work starts with someone emailing a problem they could not solve. Tell us about yours.