Power Projects
Your own solar, hybrid systems and independent power, from the first feasibility test to a plant that stays compliant and running. Seven services, one engineer on your side.
Where to start
Where is your project right now?
Some clients are still asking whether solar makes sense. Others have a plant to design, a contractor to watch or a licence to file. Choose the stage you are at, and we show the service that fits it.
- We want solar, but we need to test the numbers first.Captive Solar Feasibility Study
- Load-shedding keeps costing us money.Hybrid System Sizing & Microgrid Design
- We need someone independent on our side of the contract.Owner’s Engineer for Captive Power Projects
- We plan to sell power as an independent producer.IPP Licensing & PPA Technical Support
- We want to feed our extra solar power into the grid.ZERA Net-Metering Registration
01Build your own power
From the first test to a plant you can finance
Size solar on your real load, design a hybrid system that rides through load-shedding, and have an independent engineer review the work before you commit.
Build your own power
Captive Solar Feasibility Study
Solar sized on your real load, with the economics tested before you spend.
“Load-shedding keeps costing us money.”
What you getHybrid System Sizing & Microgrid Design
Solar, battery and generator sizing that favours no supplier, with a bid pack.
Explore this service Guide included
If this sounds like you“We need someone independent on our side of the contract.”
What you getOwner’s Engineer for Captive Power Projects
Independent design review, testing and commissioning on your side of the table.
Explore this service Guide included
If this sounds like you“We plan to sell power as an independent producer.”
What you getIPP Licensing & PPA Technical Support
The technical file behind a licence application, and support through the ZERA process.
Explore this service Guide included
02Keep it running
Stay compliant, connected and online
A plant you own must meet the grid code, hold the right registrations and be allowed to sell the power you do not use.
Keep it running
Utility & Captive Generation
Grid-code, licensing and PPA support for your own plant or a utility plant.
“We want to feed our extra solar power into the grid.”
What you getZERA Net-Metering Registration
Net-metering registration under SI 86 of 2018, prepared from start to finish.
Explore this service Guide included
If this sounds like you“We are installing solar for our own use.”
What you getOwn-Consumption Solar Registration
A plain-English route to registering solar for your own use, with the technical file behind it.
Explore this service Guide included
Go deeper
Read the full guide
Article Projects · 10 min read
Reading a power purchase agreement: the technical schedules lenders look for
A PPA is a legal document whose value is set by its technical schedules. This guide explains the schedules that matter to developers, off-takers and lenders.
A PPA says who buys the power, at what price and for how long. The schedules say what must be delivered and how it…At 9 US cents a unit, each 1% a 10 MW plant fails to deliver costs about US$15,000 a year.Zimbabwean solar PPAs run for about 25 years, some with Treasury guarantees. Payment security and change-in-law…
Read the full guide
Article Solar · 11 min read
Is solar worth it for your factory? A feasibility study explained
How an engineer decides whether solar makes sense for an industrial site: load, roof, tariff, finance and grid rules, and the questions a good feasibility study answers.
In our 640 kWp example, solar costs about 9 US cents a unit against 11 from the grid. The saving depends on the…Solar only helps with what it replaces, which is grid or diesel power. So the study starts with your load profile…Panels produce in daylight. How much of your load runs in the day decides how much solar you can use directly.
Read the full guide
Talk to an AVEX GRID consultant
Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.