Diesel Displacement Optimization

Running on diesel during power cuts is expensive. We work out which loads can move to solar and batteries, and what you would save.

Share this service WhatsApp Email

In depth

Cutting diesel cost at a Zimbabwean site: solar, storage and generator control

Many sites in Zimbabwe run a diesel generator during power cuts, or as their main source. The generator keeps production going. But it is also one of your biggest controllable costs. This article shows how to work out the true cost of generator energy, and how to reduce it step by step.

Litresmeasure fuel use per month before any change
kWhmeasure the energy the generator supplied in the same month
US$/kWhthe unit cost that every saving measure is tested against
01

Calculate the cost of one kilowatt-hour

Three inputs give the answer: the fuel price, the generator's fuel use for each kilowatt-hour, and the other costs of running it.

The regulator sets the fuel price, and it changes with the market. So always use the current price. The method does not change.

02

What a generator kilowatt-hour really costs

Two numbers turn a generator's fuel bill into one figure you can compare with the grid. The yield is the kWh you get from each litre of diesel. The specific fuel consumption is the same thing the other way round, and engine datasheets use it. Add the fuel cost per kWh to your maintenance and capital cost per kWh and you have the true price of generator power.

03

Why load matters

A diesel engine turns fuel into electricity best when it works at a high share of its rated output. At low load, the fixed losses take a bigger share. So the litres you burn for each kilowatt-hour go up. A generator that is too big for the load wastes fuel on every run.

Read the full guide: Cutting diesel cost at a Zimbabwean site: solar, storage and generator controlAlso covered: Four ways to reduce diesel use · A simple payback logic · What to measure · What the fuel curve really looks like

What you get

Results you can take to your board or lender

See your true diesel cost

Fuel, maintenance and downtime in one cost per kWh.

A plan to replace diesel

How much solar and battery can safely replace the diesel, and in what order.

A low-risk first step

A plan in stages, so you prove the savings before the big spend.

Deliverables

What lands in your inbox

  • Generator and fuel data review
  • Cost per kWh comparison
  • Design to replace diesel in stages
  • Payback model
  • Specification and bid-review support
Engineers inspecting a canopied diesel generator set beside a buildingStandby generator

Before the call

What to bring

Rough information is fine. This is what lets us scope and quote quickly.

  • Diesel purchase records or generator running hours
  • Generator ratings and usage pattern
  • Power-cut history for the last 12 months
  • Roof or land available for solar and batteries

How we work

From first message to finished work

  1. 1

    Brief

    A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.

  2. 2

    Scope & fixed quote

    We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.

  3. 3

    Engineer & document

    We study your data, test the options and write the report or application, with every assumption stated.

  4. 4

    Hand over & support

    You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.

Questions we hear

Before you book

Do we need to stop using the generator?

No. It stays as your backup. The aim is to run it much less.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.