Diesel Displacement Optimization
Running on diesel during power cuts is expensive. We work out which loads can move to solar and batteries, and what you would save.
In depth
Cutting diesel cost at a Zimbabwean site: solar, storage and generator control
Many sites in Zimbabwe run a diesel generator during power cuts, or as their main source. The generator keeps production going. But it is also one of your biggest controllable costs. This article shows how to work out the true cost of generator energy, and how to reduce it step by step.
Calculate the cost of one kilowatt-hour
Three inputs give the answer: the fuel price, the generator's fuel use for each kilowatt-hour, and the other costs of running it.
The regulator sets the fuel price, and it changes with the market. So always use the current price. The method does not change.
What a generator kilowatt-hour really costs
Two numbers turn a generator's fuel bill into one figure you can compare with the grid. The yield is the kWh you get from each litre of diesel. The specific fuel consumption is the same thing the other way round, and engine datasheets use it. Add the fuel cost per kWh to your maintenance and capital cost per kWh and you have the true price of generator power.
Why load matters
A diesel engine turns fuel into electricity best when it works at a high share of its rated output. At low load, the fixed losses take a bigger share. So the litres you burn for each kilowatt-hour go up. A generator that is too big for the load wastes fuel on every run.
Read the full guide: Cutting diesel cost at a Zimbabwean site: solar, storage and generator controlAlso covered: Four ways to reduce diesel use · A simple payback logic · What to measure · What the fuel curve really looks like
What you get
Results you can take to your board or lender
See your true diesel cost
Fuel, maintenance and downtime in one cost per kWh.
A plan to replace diesel
How much solar and battery can safely replace the diesel, and in what order.
A low-risk first step
A plan in stages, so you prove the savings before the big spend.
Deliverables
What lands in your inbox
- Generator and fuel data review
- Cost per kWh comparison
- Design to replace diesel in stages
- Payback model
- Specification and bid-review support
Standby generatorBefore the call
What to bring
Rough information is fine. This is what lets us scope and quote quickly.
- Diesel purchase records or generator running hours
- Generator ratings and usage pattern
- Power-cut history for the last 12 months
- Roof or land available for solar and batteries
How we work
From first message to finished work
- 1
Brief
A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.
- 2
Scope & fixed quote
We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.
- 3
Engineer & document
We study your data, test the options and write the report or application, with every assumption stated.
- 4
Hand over & support
You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.
Questions we hear
Before you book
Do we need to stop using the generator?
No. It stays as your backup. The aim is to run it much less.
Keep reading
The full guide, in plain English
Guide Diesel · 10 min read
Cutting diesel cost at a Zimbabwean site: solar, storage and generator control
How to find the true cost of a kilowatt-hour from a diesel generator, and four ways to reduce it: load matching, controls, solar and storage.
Calculate the cost of one kilowatt-hourWhat a generator kilowatt-hour really costsWhy load mattersFour ways to reduce diesel useA simple payback logicWhat to measure
Read the full guide
More guides that go with this page
Storage · 10 min readSizing solar plus battery: the questions that decide the design and the costRead the guide
Agriculture · 9 min readHybrid solar microgrids for farms and agro-processors in ZimbabweRead the guide
Mining power · 7 min readPowering a mine in Zimbabwe: grid, diesel or solar plus storage?Read the guide
Talk to an AVEX GRID consultant
Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.