Energy audits10 November 2026·5 min read

Energy audit preparation checklist: what to have ready before the auditor arrives

Auditors lose their first days hunting for information you already have. Get it ready beforehand, and their time goes into finding savings.

In this article
  1. Electricity and fuel records
  2. Production and operating data
  3. Equipment list
  4. People and access
  5. Measurements the auditor will take
  6. A 90-day preparation plan
  7. What a good data pack looks like
  8. The gaps that cost the most time
  9. How AVEX GRID helps

Key points

  • Good preparation has four parts: electricity data, process and equipment data, people, and access to the site.
  • Twelve to twenty-four months of bills and the same period of production figures are the most valuable inputs.
  • A list of the ten largest loads, with nameplate data and operating hours, usually accounts for most of the energy used.
  • Name one accountable person and one deputy. Audits stall when nobody can open a door, a drawing or a data file.
  • A readiness review before a formal audit organises the records and often finds early savings that fund the audit itself.

An energy audit is a measured investigation. It shows where a site uses energy and which changes would cut the cost. The result is only as good as the information you give the auditor. This checklist follows the order in which most auditors ask for information.

Electricity and fuel records

  • Electricity bills for the last 12 to 24 months. Include the tariff class (the price list for your electricity) and your declared supply capacity.
  • Fuel purchase records for generators, boilers and vehicles, with delivery dates and quantities.
  • Any sub-meter readings, and the date each meter was last checked. A sub-meter is a meter on one part of a site, such as a machine or a tenant, so its use can be measured separately.
  • The single-line diagram, even if it is hand drawn. This is a simple drawing that shows how the parts of your electrical system connect. Add a note of your transformer ratings. A transformer raises or lowers the voltage so electricity can travel on the grid and be used safely on site.

Production and operating data

  • Monthly output in the units that matter to your business, such as tonnes, litres or units produced.
  • Shift patterns, planned stoppages and the months when output is seasonal.
  • Major changes during the period: new machines, expansions, closures or process changes.

Production data lets the auditor tell a real saving from a slow month. Without it, every difference in consumption is open to argument.

Equipment list

GroupInformation to collect
Motors, pumps and fansRated power, age, control method, annual operating hours
Compressed airCompressor ratings, pressure setpoint, known leaks, operating hours
Cooling and refrigerationPlant ratings, setpoints, defrost method, condenser condition
Heating and processBoiler or furnace ratings, fuel, temperature setpoints
Lighting and buildingsFitting types, counts, hours, building controls
Self-generationSolar, generator and battery ratings and logged output where available

People and access

Name two contactsOne accountable person with authority to approve measurements, and one deputy. Many audit delays come from a locked switch room or a missing drawing, not from engineering.
  • A maintenance contact who knows the plant history and the faults that keep coming back.
  • A finance contact who can confirm costs and the rules for approving investment.
  • Safe access to switch rooms, plant rooms and roofs, with the permits your site requires.

Measurements the auditor will take

Expect the auditor to fit loggers on the main incomer and on the largest loads. They stay for at least one full operating cycle. The auditor will also take spot readings with portable instruments. Loggers record power, voltage, current and power factor over time. Power factor shows how much of the power you draw is actually useful. A figure of 1.00 is perfect. Motors, transformers and welders pull it down, and a low figure costs you extra. Loggers turn nameplate guesses into measured profiles. That is why you can defend the findings in front of a finance committee or a regulator.

A 90-day preparation plan

  1. Days 1 to 30. Collect bills, production data and fuel records. Appoint the contacts. Start a single folder for all documents.
  2. Days 31 to 60. Build the equipment list, mark the ten largest loads and confirm how your meters are arranged. Fix any obvious leaks or faults that could distort the measurements.
  3. Days 61 to 90. Run a readiness review. Check the data for gaps, agree the audit scope and schedule the measurements around production.

What a good data pack looks like

A well-prepared pack saves days on site. It also makes the findings easier to trust.

  • Bills. Twelve to twenty-four months of electricity bills for every meter, together with the fuel records for any generators or boilers. Mark any gaps and estimated readings.
  • A single-line diagram. Even a hand-drawn sketch that shows the incomers, the main boards and the large loads is better than nothing.
  • A list of the main loads. Motors, chillers, compressors, pumps and furnaces, with their ratings and how many hours they run. Say whether they run all year or by season.
  • Production or occupancy figures for the same months as the bills, so the energy can be compared with output.
  • Metering information. Which loads have their own meters, which are sub-metered, and where the data is kept.
  • Earlier reports and changes. Previous audits, major equipment changes, and maintenance records for the large plant.

The gaps that cost the most time

The same few gaps hold up most audits. Bills may cover only part of the year. There may be no list of the large loads. Energy use may not be tied to production. These gaps are easy to close before the visit and expensive to close after it. If a figure is missing, say so. An honest gap, noted in the pack, is far more useful than a number that was guessed.

How AVEX GRID helps

  • Readiness review. We organise your records, find the likely savings and prepare the structure of the investment plan before the formal audit.
  • Measurement support. We specify and install loggers and read the results with you.
  • Clear outputs. You receive ranked measures with cost, saving and payback. They come in a format your board can use.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

How long does audit preparation take?

Most sites need four to eight weeks to collect bills, production data and equipment lists. A readiness review can run in parallel.

Do I need sub-meters before an audit?

They help, but they are not required. Temporary loggers can measure the main loads during the audit.

What if my records are incomplete?

Start with what you have. We identify the gaps, estimate what can be recovered and plan measurements to fill the rest.

Who should attend the first meeting?

The accountable contact, a maintenance lead and a finance representative. That group can answer technical questions and agree what is worth doing.

Topics: energy audit checklist Zimbabweprepare for energy auditISO 50002 audit preparationSI 122 energy auditenergy data collectionindustrial energy auditenergy readiness reviewenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Start the audit with the right data.

Tell us what records you have. We return a short list of what is missing and a plan to be audit-ready within 90 days.