Electrical power engineers
Load flow, short circuit, protection and arc-flash studies, switchgear and cable design.
- ETAP or similar tools
- Experience with industrial networks
AVEX GRID is led by its founder. We are building a network of associate engineers who can support specific projects, in Zimbabwe or remotely.

How it works
AVEX GRID is led by its founder, Devine Tafara Javangwe, a Professional Member of the Zimbabwe Institution of Engineers. When a project needs a specialist skill or extra capacity, we bring in associate engineers for that job only.
Who we need
You do not have to fit one box. Tell us what you are good at and the kind of work you want.
Load flow, short circuit, protection and arc-flash studies, switchgear and cable design.
Captive solar, hybrid microgrids and battery sizing, from yield models to single-line diagrams.
Bill checks, demand and power-factor analysis, measurement and savings plans.
Footprints, Scope 3 screening, ESG data and carbon project readiness.
Single-line diagrams, drawings and model building to a clear brief.
Metering, logging, thermography and site surveys around Harare, Marondera, Chegutu and Bulawayo.

What to expect
How to apply
No forms and no waiting list. We read every message and reply within one working day.
A short note is enough to start. We will take it from there.
Questions