Hybrid Utility Cost Recovery: Tenant Billing
Shopping centres and property estates that mix grid, diesel and solar power need a fair way to bill tenants. We design the metering plan and the billing method.
In depth
Tenant electricity billing and smart metering for Zimbabwean property owners
Many Zimbabwean shopping centres, office parks and apartment blocks get power through a single utility connection. The owner then recovers the cost from the tenants. When tenants dispute their charges, the landlord loses time and goodwill. This guide explains how to set up fair billing that you can defend. It also covers what to check on the rules side.
The numbers that cause trouble
- Common-area load. Lifts, lighting, pumps and security are real costs. Decide at the start how you share them, and write it in the lease.
- Maximum demand. The main meter carries a demand charge. This is the part of the bill based on your highest power in the month, not on how much energy you used. Tenants do not…
- Losses. The sum of the sub-meters is never exactly the main meter. A gap of a few percent is normal. A large gap points to faults, theft or a wrong meter multiplier.
- Tariff changes. The tariff is the price list for electricity: the rates per unit, per kVA and the fixed charges. If the utility changes it in the middle of a month, the invoices should…
Setting up a sub-metering system
- Survey the building. Trace the supply to each tenant and note shared circuits. Many buildings have cross-wired circuits that you must separate first.
- Choose meters. Use accurate meters that resist tampering. They should have a recognised accuracy class. Size them to each tenant's load. For three-phase tenants, use three-phase meters.
- Install and commission. Fit current transformers where needed. Check the phase sequence. Calibrate or test against a reference.
- Set the billing rules. Define the rate, the share of common-area cost and how disputes are handled. Put them in the lease or an addendum.
Beyond billing: finding savings
Smart sub-meters record use at short intervals. This data shows when tenants and common areas peak, which loads run overnight and where a power-factor or demand problem lies. Landlords often find savings in common-area lighting, pumps and air-conditioning schedules. Where the roof is suitable, solar can serve the common load and, with the right approvals, the tenants. See our guide to solar and net metering.
Read the full guide: Tenant electricity billing and smart metering for Zimbabwean property ownersAlso covered: Meter accuracy and what to specify · Prepaid systems: what to check before you buy · Allocating the maximum demand charge · The regulatory question, handled carefully
What you get
Results you can take to your board or lender
Fair, open billing
A method tenants can understand and accept.
Costs recovered
Shared solar and generator costs split fairly.
Deliverables
What lands in your inbox
- Metering plan
- Method for splitting costs and tariff schedule
- Billing template and checklist for reconciling bills
Tenant sub-meteringBefore the call
What to bring
Rough information is fine. This is what lets us scope and quote quickly.
- List of tenants and their meters
- Landlord utility bills for 12 months
- Lease clauses on utility charges
- Shared loads such as lifts and lighting
How we work
From first message to finished work
- 1
Brief
A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.
- 2
Scope & fixed quote
We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.
- 3
Engineer & document
We study your data, test the options and write the report or application, with every assumption stated.
- 4
Hand over & support
You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.
Questions we hear
Before you book
Is there a regulatory limit on resale?
There can be. We check the current rules with you before you set a tariff.
Keep reading
The full guide, in plain English
Guide Property · 9 min read
Tenant electricity billing and smart metering for Zimbabwean property owners
How landlords, shopping centres and office parks can bill tenants fairly for electricity: sub-metering, prepaid options, the licensing question, and common disputes.
The numbers that cause troubleSetting up a sub-metering systemBeyond billing: finding savingsMeter accuracy and what to specifyPrepaid systems: what to check before you buyAllocating the maximum demand charge
Read the full guide
More guides that go with this page
Metering · 7 min readSmart meter verification: how to prove your electricity bills are rightRead the guide
Tariffs · 10 min readZimbabwe electricity tariffs explained: maximum demand, power factor and how to cut your billRead the guide
Solar · 9 min readSolar for business in Zimbabwe: own-consumption licences, net metering and when it paysRead the guide
Talk to an AVEX GRID consultant
Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.