Two engineers reviewing drawings at a substation
Press & media kit

Everything a journalist or partner needs about AVEX GRID.

Logos, boilerplate descriptions, founder bio, headshots, and brand-colour reference. All freely usable in articles, slide decks, panel programmes, conference materials, and tender annexes.

Free to usein articles, slides, programmes and tender annexes
4logo versions in vector and PNG
5brand colours with codes
Same dayreply on most press requests

Logos

Four approved logo files

Pick the one that fits your medium. Please keep the logo whole: do not stretch, recolour or add effects.

Full logo

Full logo

Vector SVG. Scales to any size. For letterheads, slide decks, large print, vehicles and signage.

SVG PNG

White version

White version

For dark backgrounds, photos and video.

SVG

Compact lockup

Compact lockup

Transparent PNG. For headers, email signatures and social profiles.

PNG

Icon

Icon

Transparent PNG. For favicons, app icons and avatars.

PNG SVG

Brand colours

Click a colour to copy its code

Boilerplate

Copy-paste descriptions for any context

One sentence

AVEX GRID is an independent Zimbabwean electrical engineering and energy consultancy serving mines, mills, IPPs and large commercial operators.

25 words

AVEX GRID is a Zimbabwe-based electrical engineering and energy consultancy. We deliver ETAP-modelled studies, energy readiness reviews and bankable feasibility packs for industrial and IPP clients.

Full boilerplate

AVEX GRID is an independent Zimbabwean electrical engineering and energy consultancy, founded in 2025 and based in Marondera. The practice delivers ETAP-modelled electrical studies (load flow, short circuit, protection coordination, arc flash), energy readiness reviews for the new energy-management rules, bankable feasibility studies for captive solar and Independent Power Producer registration, and grid-code compliance work for ZETDC interconnections. The founder is a ZIE Professional Member.

Engineers reviewing readings at a substation
AVEX GRID in the field

Founder

Devine Tafara Javangwe

Founder and lead consulting engineer. Two bios, ready to paste.

Short, for programmes

Devine Tafara Javangwe is the founder of AVEX GRID Energy Consultancy. ZIE Professional Member.

Long, for articles and profiles

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID Energy Consultancy. He holds a Master of Science in Electrical Power Engineering from Southern Federal University and authored a 118-page MSc dissertation on industrial load-flow and power-quality forensics for Zimbabwean grid conditions. He is a Professional Member of the Zimbabwe Institution of Engineers (ZIE20265434) and works with IPMVP measurement and verification methods. His focus is practical engineering work for Zimbabwean industry: energy studies, ETAP studies, captive-solar feasibility and grid-code compliance, delivered to international standards and priced for the local market.

Press and media contact

For interviews, panel invitations, expert comment or company-profile material, write to Devine Tafara Javangwe, Founder. inquiries@avexgrid.com, +263 78 488 9775.