Engineers reviewing documents and plans at a meeting table
Energy PerformancePractical guide inside·5 min read

Energy Readiness Reviews

Rules for large electricity users are getting stricter. A readiness review puts your data in order, finds likely savings and prepares you for a licensed audit.

Share this service WhatsApp Email

In depth

Energy audit preparation checklist: what to have ready before the auditor arrives

An energy audit is a measured investigation. It shows where a site uses energy and which changes would cut the cost. The result is only as good as the information you give the auditor. This checklist follows the order in which most auditors ask for information.

01

Electricity and fuel records

  • Electricity bills for the last 12 to 24 months. Include the tariff class (the price list for your electricity) and your declared supply capacity.
  • Fuel purchase records for generators, boilers and vehicles, with delivery dates and quantities.
  • Any sub-meter readings, and the date each meter was last checked. A sub-meter is a meter on one part of a site, such as a machine or a tenant, so its use can be measured separately.
  • The single-line diagram, even if it is hand drawn. This is a simple drawing that shows how the parts of your electrical system connect. Add a note of your transformer ratings. A transformer raises…
02

Production and operating data

  • Monthly output in the units that matter to your business, such as tonnes, litres or units produced.
  • Shift patterns, planned stoppages and the months when output is seasonal.
  • Major changes during the period: new machines, expansions, closures or process changes.

Production data lets the auditor tell a real saving from a slow month. Without it, every difference in consumption is open to argument.

03

People and access

  • A maintenance contact who knows the plant history and the faults that keep coming back.
  • A finance contact who can confirm costs and the rules for approving investment.
  • Safe access to switch rooms, plant rooms and roofs, with the permits your site requires.

Read the full guide: Energy audit preparation checklist: what to have ready before the auditor arrivesAlso covered: Measurements the auditor will take · A 90-day preparation plan · What a good data pack looks like · The gaps that cost the most time

What you get

Know where your money goes, and what to fix first

A ranked savings list

Each measure with its cost, saving and payback, so you start where the return is best.

Ready for the new audit rules

We help you sort your data, meters and records so a licensed audit and your reporting go smoothly.

A plan you can fund

An investment plan in stages that your finance team can approve step by step.

Deliverables

What lands in your inbox

  • Review of your bills and demand (12 to 24 months)
  • Site walk-through and load-logging plan
  • Savings measures ranked by payback
  • Investment plan in stages
  • How savings will be measured and verified (IPMVP)
  • Executive summary and technical report
Two consultants reviewing a load-flow study in a Harare officeLoad-flow studies

Before the call

What to bring

Rough information is fine. This is what lets us scope and quote quickly.

  • Your last 12 months of ZESA bills
  • Any load-logging or sub-meter data you already have
  • A site plan or equipment list (motors, chillers, compressors)
  • The name of your licensed auditor, if you have one

How we work

From first message to finished work

  1. 1

    Brief

    A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.

  2. 2

    Scope & fixed quote

    We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.

  3. 3

    Engineer & document

    We study your data, test the options and write the report or application, with every assumption stated.

  4. 4

    Hand over & support

    You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.

Questions we hear

Before you book

Is this a licensed energy audit?

Energy audit work is regulated. We provide readiness reviews and gap checks, and support your licensed auditor or energy manager. We will not describe our work as something it is not.

Which sites does this suit?

Sites with large electricity bills or maximum-demand charges: factories, farms, processing sites, hotels, hospitals, schools and offices.

What will it cost?

We give a fixed quote after a short scoping call. It depends on the size of your site and the data you have.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.