Captive Solar Feasibility Study

Is solar worth it for your site? A feasibility study sizes the system on your real load, tests the economics and maps the regulatory route, before you commit any money.

Share this service WhatsApp Email

In depth

Is solar worth it for your factory? A feasibility study explained

Companies often ask whether solar is worth it. The honest answer is that it depends on four things. First, when you use power. Second, how much space and sun you have. Third, what you pay for the energy you replace. Fourth, how the project is financed and licensed. A feasibility study tests each of the four.

US$691per kW, global average installed cost of utility-scale solar in 2024 (IRENA)
4.3per kWh, global average levelised cost of utility-scale solar in 2024 (IRENA)
US$192per kWh, utility-scale battery storage in 2024 (IRENA)
01

The yardsticks, in plain words

A solar decision rests on a handful of numbers. If two quotations use them differently, you cannot compare them. Here is what each one tells you.

02

Step 1: Understand the load

The study starts with 12 to 24 months of your bills. It also uses a measured profile of your load over a typical week. The question is how much of your demand happens in daylight. A day-shift factory with refrigeration uses most of its energy while the sun is up. A 24-hour operation can use solar for a smaller share, unless you add batteries.

03

Step 2: Assess the site

  • Area and orientation. The roof or ground area, and the tilt and direction of the panels, set how much capacity fits.
  • Structure. The roof must carry the extra weight and the wind forces. An engineer checks its condition before the design is fixed.
  • Shading and dirt. Nearby buildings, trees and dust reduce output. We include them in the yield model.

Read the full guide: Is solar worth it for your factory? A feasibility study explainedAlso covered: Step 3: Model the energy · Step 4: Test the economics · A worked case: a 640 kWp plant for a 180,000 kWh a month site · What moves the answer most

What you get

A decision you can defend to your board or a lender

Real numbers

System size, cost per kWh over its life (LCOE), payback and returns, worked out from your own bills and tested against changes.

Risks written down

Technical, regulatory and financial risks, each with a way to reduce it.

Written for lenders

Laid out so a bank or funder can follow every assumption.

Deliverables

What lands in your inbox

  • Your demand pattern, from your data
  • Solar and battery options compared
  • Cost per kWh (LCOE), payback and returns, tested against changes
  • Summary of the regulatory route
  • List of risks
  • Summary for your board
An engineer with a tablet beside an open containerised inverter station on a solar plantInverter station

Before the call

What to bring

Rough information is fine. This is what lets us scope and quote quickly.

  • 12 months of bills and any half-hourly data
  • Roof or land layout, or satellite coordinates
  • Diesel use and power-cut history
  • The single-line diagram, or a photo of your main panel

How we work

From first message to finished work

  1. 1

    Brief

    A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.

  2. 2

    Scope & fixed quote

    We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.

  3. 3

    Engineer & document

    We study your data, test the options and write the report or application, with every assumption stated.

  4. 4

    Hand over & support

    You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.

Questions we hear

Before you book

What do you need from me?

Twelve months of electricity bills, a site layout or roof area, and any logged demand data. We plan the rest with you.

What if solar does not make sense for my site?

Then the study says so and tells you what to do instead. That is still a useful answer for the cost of a study.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.