Engineers in hi-vis reviewing an electrical substation site in Zimbabwe

About AVEX GRID

An independent practice for Zimbabwe’s energy transition.

We are an electrical engineering and energy consultancy based in Zimbabwe. Devine Tafara Javangwe, an electrical power engineer, started us in 2025. We help factories, businesses and independent power developers cut energy costs, plan their own power generation and get ready for regulatory checks.

2025Started in Marondera, working across Zimbabwe
ETAPPower-system modelling in practice since 2021
MScElectrical Power Engineering, Southern Federal University
ZIEProfessional Member, Zimbabwe Institution of Engineers

01 Our story

Built for Zimbabwean industry, by a Zimbabwean engineer.

We visit your site, model it in ETAP, and stay until it is switched on.

AVEX GRID exists because of a gap we kept seeing. Big operators pay international consultancies that fly in, model the plant in software nobody on site understands, and leave before commissioning. Others pay nobody, get nothing, and are penalised by ZERA or ZETDC.

We do the modelling in ETAP. We come to your site. We write the report in plain language that a board can approve and a lender can rely on. And we stay until commissioning.

Engineers surveying a proposed solar site in Zimbabwe
Founder & lead engineerDevine Tafara Javangwe

02 Founder & lead engineer

Devine Tafara Javangwe

Devine is the founder and lead consulting engineer at AVEX GRID. He holds a Master of Science in Electrical Power Engineering from Southern Federal University (2025). His 118-page MSc dissertation covered how power flows through industrial plants (load-flow studies), how big the current is in a fault (short-circuit analysis, IEC 60909), and how to trace poor power quality (IEC 61000-4-30 / IEEE 519), all for Zimbabwean grid conditions.

Credentials

  • ZIE Professional Member (Registration ZIE20265434)
  • Work prepared to ZERA, IEC and IEEE requirements
  • IPMVP-conversant (the standard for proving energy savings)
  • IEEE member

Focus areas

  • Energy readiness reviews, from a quick walkthrough to lender-grade detail
  • ETAP electrical studies to meet the grid code
  • Feasibility studies written for lenders, for your own solar plant or IPP registration
  • Finding the cause of power-quality and protection problems on ZESA / ZETDC supply

03 How we work

Four ways we work.

01

Locally grounded

Every recommendation uses real ZESA tariffs, real ZETDC supply conditions, and real Zimbabwean labour and equipment lead-times. Not US benchmarks.

02

Standards-defensible

IEC 60909, IEEE 519, IEEE 1584, IPMVP, ZWS: every report names the standard it follows. Lenders and regulators can read them as they are.

03

Independent

We do not sell hardware, do installation contracts or take rebates from suppliers. Our advice is what we think you should do, not what we are paid to recommend.

04

Honest about scale

We started in 2025. We tell clients what we have modelled and what we have commissioned. No invented decades of experience, just depth you can check.

→ Where we can help

Tell us the problem. We will scope the work.

Site team reviewing a cable trench at a substation under construction in Zimbabwe
Grid and substationsStudies and protection support.
Engineers surveying a proposed solar site in Zimbabwe
Solar and storageSite surveys to feasibility.
Engineer inspecting a motor control centre in a plant room
Plants and factoriesLoad logging and savings.

04 The team ahead

We’re hiring for 2026.

AVEX GRID is a one-engineer practice for now. We limit how many jobs we take so the quality holds up. As demand grows we plan to add a senior electrical engineer, a measurement-and-verification analyst and a project coordinator. If you are a Zimbabwean engineer who knows ETAP, or has solar (PV) or battery (BESS) experience, get in touch.

Join the engineering network

People and frameworks

Who does the work, and the standards it is prepared to

AVEX GRID is led by an engineer. A qualified electrical engineer prepares or reviews every report, and each one states its assumptions, data sources and limits.

Our engineers and credentials

What makes a report defensible. Measured data, written-down assumptions, recognised methods (IEC, IEEE, IPMVP) and a named engineer who is accountable for the result. That is what a board or lender can rely on.

Professional standing. Led by Devine Tafara Javangwe, Professional Member of the Zimbabwe Institution of Engineers (ZIE). We add specialist certifications to this page once they are awarded and verified.

Standards and regulatory alignment

Built to what approvers use. We prepare our work against the regulations and standards that your approvers and lenders actually use, so our reports hold up when they are reviewed.

Zimbabwe Energy Regulatory Authority (ZERA). Our technical methods are based on ZERA service guidelines for net-metering, IPP licensing, energy audits and technical reports.

Tender and application readiness. We prepare technical submissions to the requirements of each tender or application, and tell you plainly if you need a registration or a partner before you bid.

Want to work with us?

Book a 30-minute scoping call. We will tell you honestly whether we can solve your problem well. If not, we will say who to talk to instead.