ZETDC Bill Doctor
Pick your tariff and type your bill. Every line is checked as you type.
A bill check, not an audit. A red line is a question for ZETDC, not proof of a mistake. What you type stays in your browser. The report is a two-page PDF with the working.
How it works
Three steps. No sign-up.
- 1Pick your tariffChoose it from the list. We show the official rates for it.
- 2Type your billMeter numbers first, then the amounts the bill charged.
- 3Read the resultGreen lines match. Red lines are questions for ZETDC, with a ready-made message.
Questions
Where do I find these numbers on my bill?
Most ZETDC bills list the meter readings, the kWh, the maximum demand in kVA and the reactive energy in kvarh near the top, and the charges line by line below. If you cannot find one, leave it empty and type the rest.
Is this an energy audit?
No. It is a bill check. It compares your bill with the published ZETDC tariff schedules. An energy audit is a different, licensed piece of work.
What does a red line mean?
It means your bill and the published rates give different amounts. It does not prove a mistake. It is a question to put to ZETDC, and the tool writes the message for you.
Which rates do you use?
The ZERA-approved ZETDC tariff schedule of 1 December 2023 and the exporters and forex-earners schedule of 20 October 2023. If ZETDC has changed a rate since, choose "My bill shows different rates" and type yours.
Why are there four ways of adding levy and VAT?
The schedule says the rates exclude the 6% REA levy and VAT, but it does not say which lines they are worked out on. We show the four readings and tell you which one your total matches.
Does it save my bill?
No. What you type stays in your own browser so you can come back to it. Nothing is sent to us unless you press "Send to an engineer".
Can it check a home or a prepaid meter?
Not yet. This first version is for maximum-demand and flat-rate business tariffs. Homes are on our list.