Blackout Cost Check

Move the sliders. The cost of your power cuts updates as you go.

AVEX GRIDBLACKOUT COST

Typical numbers are starting points. Replace them with yours. An estimate, not an energy audit or a quote. What you type stays in your browser. The report is a two-page PDF with the working.

How it works

Three steps. No sign-up.

  1. 1Tell us about your sitePick the type. We fill in typical numbers.
  2. 2Describe the cutsHours and number of cuts in a normal week, and what you run on.
  3. 3See the costPer month, per year, where it goes, and how backup options compare.

Questions

Where do the typical numbers come from?

They are starting points for each kind of site. They are not measured data. Replace them with your own and the result gets better.

Why is lost output not the full value of the lost hours?

Many sites make up some of the work later with overtime or extra shifts. We count 60% of lost output as gone for good. You can see this in "How we worked this out".

Does it include the cost of a generator or solar?

No. It shows the running cost of each backup option for the same cuts. Equipment cost depends on your site and needs a proper study.

What diesel price do you use?

The ZERA maximum pump price for October 2026, US$2.04 a litre, unless you type your own.

Is this an energy audit or a quote?

No. It is an estimate from the numbers you type. An energy audit is a different, licensed piece of work.

Does it save my numbers?

Only in your own browser, so you can come back. Nothing is sent to us unless you press "Send to an engineer".