Environmental Policy
Our work exists to cut energy waste and emissions, so our own conduct and claims must stand up to the same scrutiny. This is what we commit to.
01Our commitment
We aim to help clients use less energy, replace diesel and grid power where it pays, and measure the result. We also aim to keep the footprint of our own practice small.
02Our own footprint
- Remote first. Modelling, reviews and meetings happen remotely wherever the task allows. We travel when a site visit adds real value, and we combine trips.
- Paperless. Reports and drawings are delivered digitally. We print only on request.
- Light website. Our site is a lean static build with optimised images and no tracking scripts, which keeps its energy use low.
- Equipment. We buy durable equipment, repair before replacing, and send electronic waste to responsible recyclers.
03Our advice
- We recommend the lowest-cost, lowest-carbon option that meets the client's reliability needs, and we show the trade-offs.
- We design for safety and for the environment of the site, including the end of life of batteries and panels.
- We encourage clients to measure results after the project so savings are proven, not assumed.
04Honest carbon and savings claims
We do not make unsupported environmental claims. Every emission or savings figure states its method, boundary and source, and is labelled indicative until measured.
The grid emission factor in our calculators is an editable assumption. Different published sources give different values for the regional grid, so we show the figure used and let you change it.
05Compliance
We follow Zimbabwean environmental law and the requirements of the Environmental Management Agency (EMA) in our own conduct. Where a client project needs an environmental impact assessment or a licence, we say so and point the client to the right route.
06Review
We review this policy at least once a year. Suggestions are welcome at inquiries@avexgrid.com.
Questions about this policy? We answer plainly and promptly.
Contact us