Hybrid System Sizing & Microgrid Design

Solar, batteries and generators working together. We size the system on your real load and design the protection and controls so it runs safely.

Share this service WhatsApp Email

In depth

Sizing solar plus battery: the questions that decide the design and the cost

A hybrid system combines solar panels, a battery, and the grid or a generator. The setup that suits a clinic is different from the one that suits a cold store or a mine camp. This article explains the questions an engineer asks. We list them in the order in which the answers shape the design.

kWhenergy: how long the battery can supply a load
kWpower: how much the battery and inverter can supply at once
DoDdepth of discharge: the share of the rated energy that you may use
01

Question 1: What is the battery for?

One battery can serve more than one purpose, but each purpose adds a requirement. So name your first priority. Otherwise you may get a system that is large and expensive and still fails at the one job that matters.

02

Question 2: Which loads must stay on?

List every load and mark it as critical, important or flexible. A clinic's vaccine fridge and theatre lights are critical. A water pump is flexible, because it can run when the sun is high. This list is the most important input to the design. It cuts the battery size more than any change to the equipment.

03

Three terms, explained

Batteries are described by two numbers that are easy to confuse. Energy (kWh) sets how long the battery can supply a load. Power (kW) sets how large a load it can supply at once. A datasheet adds a few more terms.

Recharging sets the size of the solar array. To refill the battery in one day, the array must make the battery's usable energy, plus the losses, from a day's yield of about 4.5 kWh per kWp.

Read the full guide: Sizing solar plus battery: the questions that decide the design and the costAlso covered: Question 3: How much energy and how much power? · Question 4: How is the solar array sized? · What each hour of backup costs · Why solar alone does not keep the lights on

What you get

Reliable power when the grid is not

Solar and batteries of the right size

Sized to your real usage, not a brochure number.

Protection that works

Studies so generators, inverters and the grid work together safely.

Lower diesel cost

A model showing how much diesel you save and the payback, under realistic power-cut scenarios.

Deliverables

What lands in your inbox

  • Usage pattern and power-cut analysis
  • Solar, battery and generator sizing
  • Single-line diagram and protection concept
  • Financial model, tested against changes
  • Specification for tender
A hybrid solar and battery installation on a Zimbabwean farm with an irrigation pivot behindHybrid solar and battery

Before the call

What to bring

Rough information is fine. This is what lets us scope and quote quickly.

  • Your usage pattern or 12 months of bills
  • Power-cut log and current generator details
  • Site layout and available roof or land area
  • Budget range and any lender requirements

How we work

From first message to finished work

  1. 1

    Brief

    A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.

  2. 2

    Scope & fixed quote

    We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.

  3. 3

    Engineer & document

    We study your data, test the options and write the report or application, with every assumption stated.

  4. 4

    Hand over & support

    You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.

Questions we hear

Before you book

Can you also supply the equipment?

No, which keeps our design independent. We write the specification and help you compare bids.

Will it work with our existing generator?

Usually yes. We check in the design that the controls and protection work together.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.