If you don't see your question here, email inquiries@avexgrid.com or book a free scoping call. We'd rather answer once than have you read three pages of marketing.
Understanding your electricity bill
It is your highest short-term pull on the grid in the month, billed per kVA. One short spike sets the charge for the whole month. For example, at US$10.18 per kVA (the 11 kV capacity charge on the December 2023 ZETDC schedule), a 520 kVA peak costs about US$5,294. Staggering motor starts to bring it down to 440 kVA saves about US$815 a month.
Power factor shows how much of the power you draw is useful. Motors and transformers pull it down. On the schedule effective 1 December 2023, ZETDC charges US$0.052 per kvarh of reactive energy above 33% of your active energy, which matches a power factor of about 0.95. Tariffs change, so we read the rule from your own bill.
Yes. Send us your last twelve bills and we check each line against your tariff and meter readings. You can also try our free Bill Doctor tool, which covers maximum-demand and flat business tariffs. We call this a bill check, not an audit.
Your last twelve bills (photos are fine), your tariff class if you know it, and a note of any generator or solar already on site. Missing months are fine. We tell you what we could not check.
The questions intensive-energy users ask.
The cost depends on site size, how much metering and data you already have, and whether you want a walkthrough review or an investment-grade study with measurement and verification. We quote a fixed fee after a free scoping call, so there are no hourly surprises.
It depends on site size and how quickly data arrives. As a planning guide, a walkthrough review is typically a few weeks and an investment-grade study several weeks longer. The usual bottleneck is collecting 12 months of bills and meter data, so start that first.
We prepare audit reports to the format and methods the regulator and your lenders expect (IPMVP, ISO 50001-aligned where requested) and support you through submission and review. We do not certify our own work; the regulator and any independent verifier do. Ask us which registrations a particular submission needs and we will tell you plainly.
We do not install hardware, run contracting crews or take supplier rebates. Where you want it, we stay engaged during implementation as your independent technical adviser: reviewing tenders and specifications and checking test and commissioning records. Contractors are appointed through a separate tender that we can help you run.
Becoming your own power supplier.
For many industrial operators, yes, but it depends on your tariff and load. As we read the 2026 rules, own-consumption generation in the middle size range is registered rather than licensed, while larger or commercial projects follow a licence route and may need a grid-impact study. Exact thresholds can change, so we check the current official text on every project and model each route in the feasibility pack.
The economic floor depends on your tariff and load profile more than on size. We run the LCOE, IRR, NPV and DSCR on your actual bill data, not on industry averages, and tell you plainly if the numbers do not work.
A bankable feasibility study is a report whose technical, financial and risk sections are written to withstand lender due-diligence. Lenders and development funders typically expect one before funding a captive-solar or IPP project. We structure ours the way funders read them: P50/P90 yield, sensitivity analysis, debt-service coverage and a technical risk register.
Export arrangements exist under SI 86 of 2018 (Net Metering) and later rules, with conditions. Credit rates and limits have been reported inconsistently, so we confirm the current terms before you commit. We help you structure the metering arrangement and any supply agreement; this is an advisory engagement as much as a technical one.
The regulations behind the work
As we read it, SI 122 of 2026 sets energy-management requirements for large energy users. Whether it applies to you depends on your consumption and sector. Our ten-step guide walks through it, and we check the current official text on every job. Start with the guide, then ask us about your site.
The route depends on the size of the plant and whether you export. We prepare the technical pack and the single-line diagram for the application and tell you which approvals are needed. Our step-by-step net-metering guide lists the paperwork.
We do not claim any registration we do not hold. We prepare work to ZERA, IEC, IEEE and IPMVP requirements, and we tell you plainly if a submission needs a licensed or registered party so you can plan for it.
The technical work.
That is a power-quality investigation. We arrange Class A monitoring of the incoming supply to IEC 61000-4-30, then compare the results with IEEE 519 harmonic limits. The report sets out the evidence clearly, so you and your supplier can resolve the dispute on the data.
Load flow, short circuit (IEC 60909), protection coordination, arc flash (IEEE 1584), motor starting, harmonic analysis and transient stability. The founder has worked in ETAP since 2021. See the Electrical Calculations page for the full menu and a sample report.
In most cases the problem is the settings rather than the hardware. We model your as-built switchgear, recommend new settings and prepare the settings sheets for your relay engineer to apply. If relays need replacing, we tell you and write the specification. We do not sell relays.
Yes. Our arc-flash study follows IEEE 1584-2018 and includes incident-energy calculations, PPE categories and a label set. Where a regulator or insurer requires a signature or registration, we tell you in advance who must provide it.
Working with AVEX GRID.
Our office is at Autherstone Street 21, Marondera. We work with sites across Zimbabwe and take remote modelling work from elsewhere. Tell us where your site is and we will confirm how we would plan the visit.
Yes, as standard. We use a one-page mutual NDA but will sign yours instead if you prefer. We do not name clients in marketing material without written permission.
Payment milestones are agreed in the written quote before work starts. Fixed-scope work is normally paid in stages; retainers are billed in advance and time-and-materials work against timesheets. We confirm accepted currencies in the quote.
You review the draft before the final payment falls due, and we revise it once at no extra cost to address your comments. Further changes are scoped separately and agreed in writing.
No question matches. Try a shorter word, or ask us below.
Book a free 30-minute scoping call. No hard sell: if your question is a five-minute answer, we will just answer it.