Energy consultancy · Zimbabwe

Engineering Zimbabwe’s Energy Future

Audit · Comply · Build · Decarbonise

Practical engineering for Zimbabwe’s mines, factories, farms and power developers: studies, licensing support and feasibility work.

ETAP studies (power flow, faults, arc flash, protection settings), energy audit readiness for the new energy-management rules, captive solar feasibility (solar for your own site) and IPP licensing files, written so lenders, utilities and boards can follow them.

Independent energy consultancy Studies prepared to IEC, IEEE & ZERA requirements Zimbabwe & beyond
02 What we deliver

Four ways we help, each ending in a report you can act on.

A study, an application or a financial model, prepared to IEC, IEEE and ZERA requirements and written for whoever must approve it.

On site Site first, spreadsheet second.

We walk the site before we model it, so the numbers match what is on the ground.

See how we work →
A site team reviewing an excavated cable trench at a substation under construction in Zimbabwe
How we work

A clear scope, honest assumptions, a report you can use.

  1. 1

    Understand

    We start with your bills, your load data and a walk round the site, to see where the power goes and what it costs.

  2. 2

    Design

    We compare the options and rank them by payback, rule compliance and risk, so you know what to do before you spend.

  3. 3

    Deliver

    We write the studies, applications and reports, and stay with you through approval and installation.

See how we engage
Why AVEX GRID

Four promises that protect your money and your name.

Power is expensive and trust is earned slowly. This is what you can hold us to, from the first call to the final report.

  • 01Evidence

    Savings you can verify

    Every saving is checked against your own ZETDC bills and logged load data, with the method written down (IEC, IEEE and IPMVP practice). Your finance team can check it line by line.

  • 02Price

    A fixed price, in writing

    Scope, timeline and price are agreed before work starts. No hourly meter running and no surprise invoices at the end.

  • 03Honesty

    Straight answers, even when it costs us

    We sell no equipment and take no rebates, so if solar or a retrofit will not pay back on your site, we say so. Licensed audit work stays with licensed auditors.

  • 04Access

    The engineer who does the work

    You deal directly with the engineer modelling your site, on site in Harare, Bulawayo, Marondera and Chegutu or remotely nationwide. Replies within one working day.

03 Energy calculator

Check your electricity bill in 30 seconds

Type in three numbers from your ZETDC bill. We split it into energy, maximum demand and power-factor penalty, and show what you could save.

AVEX GRIDENERGY CALC

Three numbers from your ZETDC bill. Starting values suit a typical factory.

kWh
kVA
PF
Open the full calculator

Indicative estimate using editable tariff assumptions. Not a quotation or a licensed audit.

Power problems have deadlines. So do we.

Send us your last bills and a short description of the site. We will tell you what is likely to apply and what it would take.

AVEX GRID Shop

Know your bill. Meet SI 122. Size your solar.

Plain-English guides, ready-to-fill kits and Excel workbooks, written by an engineer. Yours to download the moment payment clears.

  • PDF, Word, Excel
  • Instant download
  • From US$12
Get in touch

Tell us about your project.

Please enter your name.
Please enter a valid email address.
optional
Please choose what you need.
a few lines is enough
Please tell us a little more (at least 20 characters).
Encrypted via HTTPS · privacy policy
Received · thank you

Thanks — we have your message. An engineer will reply within one working day. Check your inbox (and spam, just in case).