A technician checking a temperature logger beside a cold-store door in a horticulture packhouse
Horticulture10 November 2026·7 min read

Tobacco and horticulture: energy in curing, grading and the cold chain

Tobacco and horticulture earn good money for Zimbabwean farms, and both burn a lot of energy. Here is where it goes and how to cut it.

In this article
  1. Curing: a heat problem with a forest at the end of it
  2. Grading and packing: loads that match the sun
  3. The cold chain: an insulated box with a machine attached
  4. Reliability comes first
  5. Planning the supply across the season
  6. How AVEX GRID helps

Key points

  • Small-scale barns are reported to burn about 10 kg of wood to cure 1 kg of tobacco, and curing is widely linked to deforestation in Zimbabwe.
  • Better barns cut fuel a lot. Rocket barns use about half the firewood, but most small growers cannot afford them.
  • Use solar for daytime loads like fans, grading, packing and pre-cooling. For curing heat, solar has only been piloted so far.
  • In the cold chain, the big savings come from insulation, closing doors, the right plant size and control, and a backup that can start the compressors.
  • If a cold room fails, you lose the whole crop. So reliability comes before saving money.

On a farm, energy is all about timing. A tobacco farmer uses most of the curing fuel in just a few months. A horticulture packhouse uses most of its cooling in the weeks around harvest and export. In those weeks the load is big, and outside them it is small. Most farms are also far from the strong part of the grid. So to plan well, you need to understand how the process works and when the demand comes.

Curing: a heat problem with a forest at the end of it

Flue-cured tobacco is dried in a barn for about a week. The temperature is raised step by step to fix the colour and quality of the leaf. This needs a lot of heat. In most Zimbabwean barns the heat comes from burning wood or coal in a furnace, and the hot air is blown through the leaf. How much heat you use for each kilogram of leaf depends on three things. One is how well the barn is insulated and sealed. Another is how well the furnace passes its heat to the air. The last is how closely you follow the curing schedule.

The fuel demand is big. A widely quoted estimate, repeated by Mongabay, is that small-scale barns burn about 10 kg of wood to cure 1 kg of leaf, and that tobacco is a large cause of deforestation. Reports differ on how big the share is, so treat any single figure with care. The Forestry Commission and the Tobacco Industry and Marketing Board (TIMB) have responded with woodlot programmes. Growers must plant their own fuelwood or buy it from licensed suppliers.

There are three ways to burn less fuel.

First, improve the barn. Insulate the walls and roof, seal the doors and flues, and use a furnace and heat exchanger that pass more of the heat to the air. Government sources quoted in Business Weekly say rocket barns use about half the firewood of ordinary barns. But the Zimbabwe Tobacco Association says they cost more than most small-scale growers can afford.

Second, improve the control. Let temperature and humidity follow the schedule without someone adjusting by hand and without overshooting.

Third, change the fuel. For example, switch to coal in a suitable furnace, or later to wood from managed woodlots. In Hurungwe district, a pilot used solar power to run the blower on a coal-fired rocket furnace. That removes the need for grid power or a generator at the barn, and it reduces wood use.

Older reports put coal at about 3.5 kg of fuel for each kilogram of leaf, as the chart below shows. It is also important to be clear about what solar can and cannot do here. Solar panels are very good for making electricity for fans, controllers and lights. But they are a poor and expensive way to make high-temperature heat. So a sensible design uses solar for the electrical loads of the barn, and improves the furnace and the barn structure to burn less fuel. Solar thermal and sun-assisted barns, which are being tried in Zimbabwe, may offer another route. But there is not yet enough proof of how well they work, so judge them on measured results.

Fuel burned per kilogram of cured tobacco, reported estimatesKilograms of fuel per kilogram of leaf
Conventional barn, wood
10 kg
Rocket barn, wood (about half)
about 5 kg
Coal (older report)
3.5 kg

Estimates differ between reports, barn designs and fuels. Source: Mongabay (2022); Business Weekly (2021)

Grading and packing: loads that match the sun

After curing, and for horticulture after harvest, the crop is graded, sorted and packed. This work is done in daylight. It uses moderate, steady power for lights, conveyors, scales and packing machines, which is exactly the kind of load solar serves well. Most of the solar power is used as it is made, so you do not need batteries for most of the saving. Each unit you save is worth the full tariff, or the full cost of diesel if the site runs on a generator.

The design question is how much of the daytime load to cover with solar, and how to keep any generator running at a healthy load. Our article on hybrid microgrids for farms shows how to size the system. Our guide to diesel cost shows how to work out what a generator unit really costs, so you can work out your saving honestly.

The cold chain: an insulated box with a machine attached

The cold chain has many links, and the cold room is the one that uses the most power. A cold room is a well-insulated box with a refrigeration plant that removes the heat coming in. The power it uses depends first on how much heat comes in, and second on how efficient the plant is at removing it. Four things bring heat in. Heat passes through the walls, floor and roof. Warm air comes in when the doors are opened. Lights, fans and people give off heat. And the produce itself arrives warm from the field.

The best savings come from cutting the heat load before you touch the plant. Repair damaged insulation panels and door seals. Fit strip curtains or air curtains so less air gets in when the door is open, and train staff not to leave doors open. Cool the produce quickly after harvest, so the field heat is removed in one controlled step instead of loading the room for many hours. Once the load is lower, you can size and control the plant to match. Use fans and compressors with speed control, run defrost when it is needed and not by the clock, and keep the condensers clean and shaded so they reject heat at a lower temperature.

On solar sites, thermal storage is a good opportunity. While the sun is shining, cool the room and the produce a little deeper. The cold is stored in the produce and the room, and the compressors can rest more in the evening. The temperature must always stay inside the limits for the crop, so set the controls so the plant is never pushed past them.

Reliability comes first

In the cold chain, what you lose in a failure is not the electricity but the crop. A compressor that does not restart after a power cut, a changeover switch that does not work, or a generator too small for the starting current of the compressors can ruin a whole consignment in a few hours. So size the backup supply for the starting current of the refrigeration motors, not just their running load, and test it under load before the season starts. Put temperature alarms on the manager's phone. An early warning turns a loss into an inconvenience.

Planning the supply across the season

Because demand follows the crop calendar, the cheapest solution is often a plant sized for the long daytime loads, with a generator or the grid covering the peaks. This is better than sizing for the single busiest hour of the year. Outside the season, the solar plant can supply the farm's other buildings, pump water for irrigation, or export to the grid under net metering. That improves your return. Test each of these uses against measured load data for a full season before you fix the design.

How AVEX GRID helps

  • Seasonal load study. We measure the load at each stage and show where the peaks come from and which ones can be moved or reduced.
  • Solar and storage design. We size the plant for your daytime and cold-chain loads, and work out the fuel and grid saving month by month.
  • Backup and protection. We specify the generator, changeover switch and protection so the cold chain survives power cuts.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

Can solar run a cold room?

Yes, with the right design. A solar array covers the daytime cooling, thermal storage in the product helps carry the evening, and a battery or generator provides the backup for the rest.

Can solar replace the wood or coal used to cure tobacco?

Not directly. Photovoltaic panels suit the electrical loads of the barn, such as fans and controls. The heat itself is better addressed by improving barn and furnace efficiency, and by sustainable fuel supply.

What is the quickest saving in a packhouse?

Door discipline and repairs to insulation and seals. They cost little and cut the cooling load immediately.

What should I measure first?

Electricity and fuel use by stage over one season, and the temperature records of the cold rooms.

Topics: tobacco curing energy Zimbabwerocket barn firewoodhorticulture cold chain solarpackhouse coolingcold room energytobacco deforestation Zimbabwesolar for packhouseenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Plan your next season's energy before it starts.

Tell us what you cure, grade or cool and how much fuel and power you use. We return a plan with the load, the saving and the backup you need.

+263 78 488 9775 · Autherstone Street 21, Marondera, Zimbabwe · Remote across Southern Africa