SI 122 in ten steps: a compliance roadmap for facility managers
Rules are easier to meet as a list of steps. These ten take a facility manager from 'is my site covered?' to the yearly report.
In this article
- Step 1: Decide whether your site is covered
- Step 2: Appoint an accountable owner
- Step 3: Collect your data
- Step 4: Write the energy-management policy
- Step 5: File with ZERA on time
- Step 6: Commission a licensed audit
- Step 7: Turn findings into a three-year plan
- Step 8: Implement at least half of the savings
- Step 9: Check equipment against performance standards
- Step 10: Report every year
- A simple timeline
- Who must be licensed, and what the licence covers
- What the ratings mean
- Equipment rules that begin before your audit
- Enforcement
- A twelve-month plan for an existing facility
- What the text leaves open
- Building the data register
- How AVEX GRID helps
Key points
- The rules cover designated sites: 100 kVA or more of installed capacity, or maximum demand customers of a distribution licensee.
- Existing sites file an energy management policy with ZERA within twelve months of the rules starting. New sites file before they get a connection.
- The main duties are a policy, a licensed energy manager, a regular audit, an investment plan and a yearly report.
- Audits must lead to action. The plan must put at least half of the savings found into effect within three years.
- Start with your data and your people. It makes every later step quicker and cheaper.
SI 122 of 2026 is the Electricity (Energy Management) Regulations. It was gazetted on 31 July 2026 and puts energy management duties on larger electricity users. This roadmap turns those duties into ten steps, in the order a facility manager would tackle them. For a full account of what an audit contains, see our audit guide.
Step 1: Decide whether your site is covered
The regulations apply to designated facilities. These are sites with at least 100 kVA of installed capacity. They also include maximum-demand customers of the utility. kVA is the size of the load on your supply, and transformers and generators are rated in it. If your bill shows a maximum-demand charge, assume the rules apply and plan for it. We confirm coverage for each site against the gazetted text.
Step 2: Appoint an accountable owner
Choose a senior person to own the programme, and a deputy. The regulations require a licensed energy manager and an energy-management committee. So decide early who will sit on the committee and who will be the manager.
Step 3: Collect your data
Gather 24 months of bills, fuel records, production figures and your equipment list. You must keep records of energy, fuel and water use for at least five years. So build one clean register now.
Step 4: Write the energy-management policy
The policy follows the ZWS ISO 50001 series. ISO 50001 is an international standard for managing energy step by step. Senior leaders must endorse the policy. It states your commitment, who is responsible, your targets and how you review progress. It is short, but it is the document you file with the Zimbabwe Energy Regulatory Authority (ZERA). ZERA licenses energy businesses and approves tariffs.
Step 5: File with ZERA on time
| Type of facility | Filing of the policy |
|---|---|
| Existing facility | Within twelve months of promulgation |
| New facility | Before the electricity connection is made |
Step 6: Commission a licensed audit
A ZERA-licensed auditor must carry out your energy audit, following ISO 50002. You need one at least once every three years. The report goes to ZERA within 30 days. Prepare before the auditor arrives. Good preparation lowers the cost of the audit and improves the findings.
Step 7: Turn findings into a three-year plan
Within three months of the audit, you prepare an investment plan. It lists each measure, its cost, its saving and its payback. It also sets the order of delivery. A ranked plan lets management approve the high-return items first.
Step 8: Implement at least half of the savings
The regulations require you to carry out at least 50% of the identified savings within three years of the plan. Plan your budget for this. Keep evidence of each measure. That includes how you will measure and verify the savings using the International Performance Measurement and Verification Protocol (IPMVP), the standard way to prove how much energy a project really saved.
Step 9: Check equipment against performance standards
The regulations set minimum energy-performance standards for equipment. This includes motors, pumps, chillers, compressed-air systems, boilers and distribution transformers. New purchases should meet these standards. The audit reviews your existing equipment.
Step 10: Report every year
Once your plan is running, you must keep reporting. There are three duties:
- Send ZERA an annual implementation report within 30 days of the end of the year.
- Send energy-use returns every quarter and every year, within 14 days of each period.
- Expect ZERA to give your facility a rating from class A (best) to E. Customers and lenders will be able to see this rating.
Source: Afriwise, SI 122 of 2026
A simple timeline
Who must be licensed, and what the licence covers
The regulations create a licensing system for the people who do the work. A licence is official permission from ZERA to do a regulated energy job. Nobody may carry out an energy audit, energy management work or measurement and verification without one. An energy audit is a survey of where a site uses energy and where it can save. Verification means an independent check that reported figures are true.
Audit firms must be registered in Zimbabwe and employ at least one licensed professional. Foreign firms must show their registration and employ a licensed auditor. Published summaries say there are two categories of audit licence. Category A covers all audits, including investment-grade audits. Category B covers only the less detailed levels of audit. Licences run for three years. ZERA keeps a public register of licensed auditors. A second register lists energy service companies that ZERA has accredited.
The practical message for an owner is simple. Ask any auditor for the licence number and category, and check the register. An audit by an unlicensed person is an offence for that person. It may also not count as the audit the regulation requires.
What the ratings mean
ZERA rates each designated facility on an energy performance index. There are five classes.
- Class A, the best, is an index above 1.3.
- Class B lies between 1.0 and 1.3.
- Class C is the national benchmark at 1.0.
- Class D lies between 0.5 and 1.0.
- Class E is below 0.5.
The published summaries do not say how the index is calculated. They also do not say how a value exactly on a boundary is classed. So the method for your sector still needs to be confirmed from the gazetted schedules and any ZERA guidance. What we can say is this. Lenders, insurers and customers will probably see your rating. A facility that has measured its energy per unit of output for a few years will defend its class better than one that starts counting when the first return is due.
Equipment rules that begin before your audit
One section of the regulations deals with equipment, not facilities. It says nobody may import, sell, lease or use industrial equipment unless it meets the minimum energy performance standards in the schedules. The importer or manufacturer must also produce a certificate of conformity from an authorised testing centre.
The schedules cover air conditioners, commercial chillers, distribution transformers, three-phase electric motors, compressed air systems, boilers, pumps and industrial ovens. The summaries we read give no numerical limits, so check the schedules before you order. In the meantime, ask suppliers of these items to state the efficiency class and give you the conformity certificate. Keep both with the purchase record. The cheapest compliance step of all is to avoid buying equipment that you will later have to replace.
Enforcement
It is an offence to practise without a licence. It is also an offence for the owner of a designated facility to fail to submit an audit report. Denying ZERA access for an inspection or a statutory audit is an offence too. The reported penalty is a fine not exceeding level 5, imprisonment of up to six months, or both.
Disputes between a facility and a licensee, or with ZERA, go first to informal resolution. After that, a petition goes to ZERA, which holds a hearing and gives a binding decision. The regulations are enforced through reporting. So the best protection is a clear record: dated filings, the audit report, the investment plan and evidence of what you carried out.
A twelve-month plan for an existing facility
- Months 1 to 2: confirm coverage, name the owner and the energy manager, and gather 24 months of bills, fuel records and production figures into one register.
- Months 3 to 5: draft the policy against the ZWS ISO 50001 series, have senior leadership endorse it, and set up the committee.
- Months 6 to 8: file the policy with ZERA well ahead of the deadline, appoint a licensed auditor and book the audit.
- Months 9 to 12: support the audit with the data pack, review the draft findings, and begin the investment plan so you can file it within three months of the audit.
What the text leaves open
The summaries available at the time of writing leave several points unsettled. They do not say when the first three-yearly audit falls due for an existing facility. They give no numerical equipment limits. They do not give the cash value of a level 5 fine. They also report no transition period, apart from the twelve months for the policy.
So we check each client against the gazetted text and any ZERA guidance before we set a calendar. We advise owners to do the same, and not to rely on a summary, including this one.
Building the data register
You must keep records of daily, weekly, monthly and annual energy, fuel and water use for at least five years. You must also keep production data and floor drawings. So the register is a compliance document, not just a convenience. Keep it in one place with one owner.
For each meter, record its location, what it covers, its serial number and the date it was last checked. Record production in the unit that matters for your business, whether tonnes, litres or occupied rooms. That lets you work out energy per unit. Note every change to the plant. A baseline is the starting point you measure savings against. If it does not record a new furnace or a closed line, you cannot use it to prove a saving. A register that is easy to read is also the first thing a licensed auditor will ask for, and it shortens the audit.
How AVEX GRID helps
- Coverage check and roadmap. We confirm whether your site is designated and set the dates that apply.
- Readiness review. We organise your data, draft the policy structure and find early savings.
- Investment plan and verification. We prepare a ranked plan and the measurement method that proves the savings.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
Do the regulations apply to a farm or a hotel?
They apply to a designated facility, defined as one with at least 100 kVA of installed capacity or a maximum-demand customer of a distribution licensee. The definition of facility includes factories, mines, farms, commercial and institutional buildings.
What are the penalties?
Published summaries report a fine not exceeding level 5, imprisonment of up to six months, or both, for practising without a licence or, for an owner, failing to submit an audit report or denying ZERA access.
Does a small factory need to comply?
It depends on installed capacity and whether it is a maximum-demand customer. Sites with 100 kVA or more are covered. We check each site individually.
Who can carry out the audit?
A ZERA-licensed auditor. Audit work without a licence is an offence under the regulations.
What is the difference between a readiness review and an audit?
A readiness review organises your data, finds likely savings and prepares your files. The formal audit is performed by a licensed auditor. The review makes the audit faster and less expensive.
What happens if we miss a deadline?
The regulations provide penalties for specified offences. The practical answer is to plan the dates now and file on time.
Sources and notes