An engineer measuring flue gas at an industrial steam boiler
Compliance8 November 2026·6 min read

Energy audits in Zimbabwe: what SI 122 of 2026 requires and what you receive

Zimbabwe's new energy rules make the energy audit a duty for larger electricity users. Here is what the rules say and how to be ready.

In this article
  1. Who is covered
  2. What is required
  3. What a good audit actually contains
  4. Where the savings usually are
  5. How to prepare in 90 days
  6. Why a readiness review saves money

Key points

  • SI 122 of 2026 (Electricity (Energy Management) Regulations) was gazetted on 31 July 2026.
  • It covers "designated facilities": 100 kVA or more of installed capacity, or a maximum-demand customer of a distribution licensee.
  • Duties: a policy, a licensed energy manager, an audit every three years, an investment plan, and action on at least half the savings found.
  • Audits must be done by a ZERA-licensed auditor. AVEX GRID prepares you for the audit; it does not present its own work as a licensed audit.
  • The best preparation is 24 months of bills, a list of your biggest loads and sub-metering on them.
中文摘要 · CHINESE SUMMARY

津巴布韦能源审计:2026年第122号法令的要求与您能获得的成果

  • 据报道,2026年第122号法令(电力(能源管理)条例)已于2026年7月31日公布。我们的解读来自律所摘要,请以政府公报原文为准。
  • 据报道,适用对象为“指定设施”:装机容量不低于100 kVA,或按最大需量计费的配电用户。
  • 据报道的义务包括:能源管理政策、持证能源管理员、至少每三年一次审计、投资计划,以及落实至少一半已识别的节能措施。
  • 审计须由ZERA持证审计师完成。AVEX GRID 为您做审计前的准备工作,不会把自己的工作冒充持证审计。
  • 最好的准备:24个月的电费账单、主要负荷清单,以及对主要负荷的分项计量。
  • 我们可与海外团队远程协作,并在当地提供数据采集与现场支持。

联系方式:WhatsApp +7 900 131 7406,邮箱 inquiries@avexgrid.com。

For years, an energy audit in Zimbabwe was something a plant manager did to save money. An energy audit is a survey of where a site uses energy and where it can save, with a list of actions ranked by payback. Under the 2026 energy-management regulations, it is becoming something that a larger electricity user must do. This article explains what is required and what a good audit contains. It also shows how to avoid paying twice for the same work.

How we use thisEvery figure here is checked against your own bills, the current gazetted text and the regulator before it goes into a scope, a model or a lender file. Send us your documents and we do that for you.

Who is covered

The regulations apply to designated facilities. As summarised, that means any facility with an installed capacity of at least 100 kVA, or a maximum-demand customer of a distribution licensee. The kVA figure is the size of the load on the supply, including the part that does no useful work. Transformers and generators are rated in kVA. The word "facility" is meant broadly. It takes in factories, mines, farms, and commercial and institutional buildings and plants. In practice, if your bill shows a maximum-demand charge, assume you may be covered and plan for it.

What is required

DutyTimingIn plain terms
Energy-management policy based on ISO 50001, endorsed by senior leadershipExisting facilities: file with ZERA within 12 months of promulgation. New facilities: before connectionA written commitment, with named responsibilities and targets
A ZERA-licensed energy manager and an energy-management committeeOngoingA named person accountable for energy
Energy audit by a licensed auditor following ISO 50002At least once every three years; report to ZERA within 30 daysA measured review of where energy goes and what to fix
Three-year investment planWithin three months of the auditThe measures you will carry out, with cost and savings
Implement at least 50% of identified savingsWithin three years of the planAudits must lead to action, not just a report
Annual implementation report and energy-use returnsAnnual report within 30 days of year-end; returns quarterly and annually within 14 daysRegular reporting to ZERA
Records of energy, fuel and water useKeep for at least five yearsClean data from day one

ZERA is the Zimbabwe Energy Regulatory Authority, the national energy regulator. The regulations also set minimum energy-performance standards for equipment. This covers motors, pumps, chillers, compressed-air systems, boilers and distribution transformers. They also require ZERA to rate facilities from class A (best) to E. Auditors must hold a ZERA licence in one of two categories. A licence is official permission from ZERA to do a regulated energy job. Audit firms must be registered and employ at least one licensed professional.

There are penalties. Carrying out audit work without a licence is an offence. So is an owner failing to submit an audit report, or refusing access. The penalty is a fine up to Level 5, up to six months in prison, or both.

Energy savings suggested by industrial auditsPercent of energy use
12.7%US national audit database, same industries
27.5%Ten audits of smaller plants (study)

US data. Smaller, less-optimised plants tend to show larger savings. Source: South Dakota State University study of industrial energy audits

What a good audit actually contains

A report that sits in a drawer is a wasted audit. A good one is built like an engineering project:

  1. Baseline. 12 to 24 months of bills, production data and fuel use, adjusted so you can tell a real saving from a slow month.
  2. Energy balance. Where the kilowatt-hours go: motors, compressed air, cooling, heating, lighting and process loads.
  3. Measurements. Loggers on the largest loads and the main incomer, so the findings rest on data and not on nameplates.
  4. Measures, ranked. Each opportunity comes with its cost, yearly saving, payback and risk, in a table you can take to a finance committee. Payback is the time the savings take to repay the cost of the project.
  5. Measurement and verification. Verification means checking by an independent person that reported figures are true and the method was followed. This step shows how the savings will be proved afterwards. It uses the IPMVP options. IPMVP is the International Performance Measurement and Verification Protocol, the standard way to prove how much energy a project really saved. This way you can show you have met the 50% implementation target.
  6. Action plan. Who does what, by when, in three-year phases.

Where the savings usually are

  • Demand and power factor. Power factor shows how much of the power you draw is actually useful. A figure of 1.00 is perfect, and motors, transformers and welders pull it down. This is often the fastest, cheapest saving on a maximum-demand bill (see our tariff guide).
  • Motors, pumps and fans. Machines that are too big or throttled waste energy. Drives and right-sizing pay back well.
  • Compressed air. Leaks and high pressure settings are common and cheap to fix.
  • Cooling and refrigeration. Controls, defrost cycles and clean condensers matter more than most people expect. A defrost cycle melts the ice that builds up on cooling coils. A condenser is the part of a cooling system that throws the collected heat away to the outside air.
  • Self-generation. Solar and storage, where the numbers work, cut both energy and demand charges.

How to prepare in 90 days

  • Collect 24 months of electricity bills. Note your supply capacity and tariff class.
  • List your ten largest loads with nameplate data and operating hours.
  • Check whether the main loads have their own meters. If not, plan it now. It is the single most useful investment before an audit.
  • Name an energy champion. Start a simple monthly record of energy, fuel and water.
  • Find out from ZERA or the gazette whether and when the rules apply to your site, and which licensed auditors are available.
  • Book a readiness review, so that you know your likely savings before the licensed audit begins.

Why a readiness review saves money

A licensed audit is priced largely by the time the auditor spends finding data. When your records, metering and a first list of opportunities already exist, that time falls. A readiness review also gives you a stronger position when you talk price. You know what the audit should find. AVEX GRID provides this preparation and the engineering behind it. We do not present it as a licensed audit, and we work alongside your licensed auditor.

For investors and new plantsNew facilities must file their energy-management policy before they receive an electricity connection. If you are building in Zimbabwe, build energy metering and records into the design. Do not leave them for a retrofit later. A retrofit means fitting new equipment into an existing building or plant.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

Does my business need an energy audit?

facilities of at least 100 kVA installed capacity, or maximum-demand customers, are covered. Your bill is the quickest test: a maximum-demand charge is a strong hint. We confirm coverage for your site.

How often must an audit be done?

At least once every three years by a licensed energy auditor, followed by an investment plan within three months.

Can AVEX GRID carry out the licensed audit?

No. Audit work must be done by a ZERA-licensed party. We provide readiness support, measurement, modelling and the engineering for the savings, and we work alongside your licensed auditor.

What happens if I do not comply?

The regulations provide for fines and imprisonment for specified offences. We explain the exposure for your site.

How long does preparation take?

Most sites can assemble records and metering in about 90 days. Sites with no sub-metering take longer.

Topics: energy audit ZimbabweSI 122 of 2026Electricity (Energy Management) RegulationsZERA energy auditmandatory energy audit ZimbabweISO 50001 Zimbabweenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Be audit-ready before the auditor arrives.

A short readiness review shows what SI 122 means for your site, what savings to expect and what to prepare. Fixed-price quote after a free call.