Measuring your carbon footprint: Scope 1, 2 and 3 for Zimbabwean companies
Customers, lenders and regulators now ask companies for their carbon footprint. Here is how to build one that stands up to questions.
In this article
Key points
- Emissions come in three groups. Scope 1 is what you burn yourself. Scope 2 is the electricity you buy. Scope 3 is everything else.
- Most Zimbabwean companies can build a good Scope 1 and 2 record from papers they already have: fuel invoices, generator logs, refrigerant top-ups and electricity bills.
- For Scope 2 you report two figures: one using the grid average, and one reflecting any green power or certificates you buy.
- Scope 3 is usually the biggest and least certain. Screen first to see which parts matter before you spend effort measuring.
- A footprint is judged by its boundary, its written method and how well each figure can be traced, not by how big the number is.
Demand for emissions data has moved from sustainability reports into commercial documents. Export customers ask for the carbon content of what they buy. Lenders ask for the emissions of the businesses they finance. Listed companies are preparing to report on climate under international standards, and they ask their suppliers for the numbers. A Zimbabwean company that cannot answer these questions in a consistent way loses time and sometimes orders. This article shows how a footprint is built step by step, using the method that nearly all these requests assume.
The standard behind the numbers
The Greenhouse Gas Protocol is the most widely used framework for counting company emissions. The World Resources Institute and the World Business Council for Sustainable Development developed it. Its Corporate Standard says how to set the boundary of the company, how to sort emissions into scopes and how to report them. Two later documents add detail: the Scope 2 Guidance of 2015 and the Corporate Value Chain (Scope 3) Standard of 2011. The protocol is under review, and new editions are expected in the coming years. But the structure of scopes has stayed stable. Other standards are built on it, including ISO 14064-1 and IFRS S2. IFRS S2 is the global standard, issued by the International Sustainability Standards Board, that asks companies to report their climate risks and emissions.
The three scopes depend on where the emission happens, compared with the reporting company.
Scope 1 is the direct emissions from sources the company owns or controls. Examples are fuel burned in boilers, furnaces, vehicles and generators, process emissions and leaked refrigerants.
Scope 2 is the indirect emissions from making the electricity, steam, heat or cooling that the company buys.
Scope 3 is all the other indirect emissions in the value chain, upstream and downstream, such as those of suppliers, transport and the use of your products. It is split into fifteen categories. They range from purchased goods and services and business travel to the use of sold products and investments.
Set the boundary first
Before any calculation, the company decides which operations are in the inventory. The Corporate Standard offers two ways to do this. Under the equity share approach, you count emissions according to your share of ownership in each operation. Under the control approach, you count all emissions from operations you control, either financially or operationally. Most companies choose operational control, because it matches the activities that management can change. You record the choice once and apply it the same way every year. A boundary that keeps shifting makes trends meaningless.
The company also picks a reporting year, which is usually the financial year. It picks a base year as well, against which future change is measured. The base year should be a normal year with reliable data. If the company later buys or sells a business, the base year is recalculated so that the comparison stays fair.
How the calculation works
Every line in the inventory has the same form: how much you did × the emission factor for it. Add the lines up and you have your footprint. Gases other than carbon dioxide are converted to carbon-dioxide equivalent, so everything is counted in one unit. Methane counts about 28 times and nitrous oxide about 265 times as much as carbon dioxide over 100 years (IPCC).
| Source | Activity | Factor | Result |
|---|---|---|---|
| Generator diesel (Scope 1) | 98,182 litres a year | 2.68 kg CO2 per litre | about 263 tonnes |
| Grid electricity (Scope 2) | 2,160 MWh a year | 0.38 t per MWh (our calculator) | about 821 tonnes |
Scope 1: what the company burns and leaks
You calculate Scope 1 by multiplying activity data by emission factors. The activity data are quantities you already record. They include litres of diesel and petrol bought for vehicles and generators, and tonnes of coal or wood burned in boilers and furnaces. They also include kilograms of liquefied petroleum gas, and kilograms of refrigerant used to top up air-conditioning and cooling systems. The refrigerant is the special fluid that carries heat from the cold space to the outside. The emission factors turn each quantity into tonnes of carbon dioxide equivalent. They come from published sources such as the Intergovernmental Panel on Climate Change guidelines or national inventories.
The record-keeping is usually harder than the arithmetic. Fuel is bought from several suppliers, generator hours are not logged, and a contractor records the refrigerant top-up instead of the company. A first inventory often finds that generator diesel is the biggest source of doubt. A simple log of litres drawn from the tank, for each generator, fixes this for next year. Our article on diesel cost shows how the same record helps both cost control and emissions accounting.
Scope 2: purchased electricity, counted two ways
For most offices and light industry, the electricity you buy is the biggest single source of emissions that you control. The Scope 2 Guidance asks you to report two figures.
The location-based figure multiplies the electricity you use by the average emission factor of the grid where you use it. It shows how carbon-heavy the system you are connected to is.
The market-based figure multiplies your electricity use by a factor that reflects the choices you made. Electricity covered by renewable energy certificates counts at the factor of its source, which is often close to zero. The same applies to power from a renewable generator under a power purchase agreement, and to power from your own solar plant. Certificates change the market-based figure but not the location-based one.
The choice of grid factor needs care in Zimbabwe. Our power comes mainly from hydropower at Kariba and coal at Hwange, and the share of each depends on the rainfall of the year. Published factors differ by source and by year. So cite the source and the year you use, and use the same one in later years. One point to remember is that your own solar plant reduces both figures, because the electricity it supplies is not drawn from the grid. Our article on I-REC certificates covers the certificates in detail.
- Hydropower68.2%
- Coal and other31.8%
ZERA figures as cited in the I-REC country assessment. IEA data cited elsewhere put hydropower near 57% and coal near 41%. The mix shifts with the hydrology of each year. Source: I-REC Standard, country assessment, Zimbabwe
Scope 3: screen before you measure
For many companies Scope 3 is the majority of emissions. It is also the hardest to measure, because the data sit with suppliers and customers. So the Corporate Value Chain Standard advises a screening exercise first. You estimate each of the fifteen categories using simple data, such as money spent or tonnes bought multiplied by average factors. This shows which categories are material, meaning big enough to matter.
A cement producer will find that purchased materials and transport dominate. A retailer will find that purchased goods and the use of sold products dominate. A bank will find that its investments and loans, category fifteen, dwarf everything else. You then spend effort on the few material categories, using better data from suppliers where possible. The rest you record as immaterial, with the reason. Our article on Scope 3 screening for exporters works through an example.
Quality, verification and the common errors
An inventory is useful when someone else can follow it. A short method note records the boundary, the consolidation approach, the sources of activity data and emission factors, and what you left out and why. A data table keeps each activity quantity next to its source document. The company reviews the file internally. If the audience requires it, an independent body can verify it under ISO 14064-3.
Several errors keep appearing. Double counting happens when the same emissions show up in two scopes or in two operations. Mixed units, such as litres entered as kilograms, give results that are wrong by a large factor. Using a factor from the wrong year or country, or leaving out refrigerant leaks, gives a steady bias. Reporting only a headline figure, without the data behind it, makes the inventory impossible to verify.
Turning the inventory into a plan
A footprint has little value if it only records the past. Once you know the main sources, you can rank the ways to cut them by cost for each tonne avoided. The options include efficiency measures that pay for themselves, solar and storage that replace grid and generator energy, fuel switching and refrigerant management. The inventory gives each option a measurable starting point. It also gives management a target that can be tracked. This is the link between carbon accounting and the energy work described in our audit guide. The same meters and records serve both.
How AVEX GRID helps
- Inventory build. We set the boundary, collect the activity data and calculate Scope 1 and Scope 2 with documented factors, and screen Scope 3.
- Methodology note and data pack. We prepare the documents that a customer, lender or verifier will ask for.
- Reduction plan. We rank the measures by cost per tonne and show the effect on the footprint of efficiency, solar and fuel changes.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
Do we have to measure Scope 3?
It depends on who asks. Many customers and lenders ask for it. A screening exercise shows which categories matter, so that effort goes to the few that do.
Which emission factor should we use for electricity?
Use a published national or regional grid factor, cite its source and year, and keep the same one from year to year. Report a market-based figure as well if you hold certificates or buy renewable power.
Does a solar plant reduce our footprint?
Yes. Electricity from an own-consumption plant is not drawn from the grid, so it lowers both the location-based and the market-based Scope 2 figures.
Do we need independent verification?
Not always. It is useful when the figures are used in a financing or a customer contract, and it is carried out under ISO 14064-3.
Sources and notes
General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.
- IPCC AR5, Working Group I, chapter 8: anthropogenic and natural radiative forcing (global warming potentials)
- GHG Protocol: Corporate Accounting and Reporting Standard
- GHG Protocol: Scope 2 Guidance
- GHG Protocol: Corporate Value Chain (Scope 3) Standard
- ISO 14064-1: greenhouse gas inventories at organisation level
- IFRS S2: climate-related disclosures