Carbon credits in Zimbabwe: how ZiCMA registration works and how to prepare
Zimbabwe wrote its carbon market rules in 2025. The opportunity is real, but the rules take a big share of every credit.
In this article
Key points
- SI 48 of 2025 makes the Zimbabwe Carbon Markets Authority (ZiCMA) the national authority for carbon trading. It replaces SI 150 of 2023.
- Of every 100 credits issued, ZiCMA takes 30, 2 go to a reserve and 1 is retired for the climate pledge. You keep 67.
- Registration runs in stages: an idea note, a no-objection letter, a design document, then a certificate valid for up to 15 years.
- Projects must prove additionality, use cautious baselines, put at least 20% of investment into local communities, and be verified by a licensed auditor.
- Things move slowly, so a complete baseline, a monitoring plan and clear land and community rights set apart the projects that register.
津巴布韦碳信用:ZiCMA注册流程与项目准备
- 2025年第48号法令(碳交易通用条例)取代了2023年第150号法令,并设立津巴布韦碳市场管理局(ZiCMA)作为碳交易主管机构。
- 政府公报原文规定:信用签发时,30%的信用额度作为“收益分成”划入国家交易账户,2%进入国家缓冲账户,1%自动注销并计入国家自主贡献(NDC),项目方获得其余67%。
- 注册分阶段进行:项目构想书(PIN)、30天内的无异议函、18个月内提交项目设计文件(PDD),随后获得最长15年有效期的注册证书。
- 项目须证明额外性、采用保守基线,至少将总投资的20%直接投向当地社区,并由持牌核查机构核查。
- AVEX GRID可提供基线与监测的技术文件、能源项目减排量测算支持,并可为海外团队远程协作(英文沟通)。
联系方式:WhatsApp +7 900 131 7406,邮箱 inquiries@avexgrid.com。
A carbon credit turns a proven cut in greenhouse gas emissions into something you can sell. One credit stands for one tonne of carbon dioxide that was avoided or removed. The buyer is paying for proof that the cut really happened. Zimbabwe has forests, strong sunshine and plenty of room to save energy, and in 2025 government wrote detailed rules for the market. This guide explains those rules as they appear in the gazetted text, what a developer must prepare, and where projects get stuck. It is for project developers, investors and companies that want to buy or sell credits from Zimbabwean projects.
The rules in brief
The Carbon Trading (General) Regulations were published in 2025 as Statutory Instrument (SI) 48 of 2025. They replace SI 150 of 2023. They create the Zimbabwe Carbon Markets Authority (ZiCMA), the national body that registers projects, approves auditors and keeps the national list of credits, called the Zimbabwe Carbon Registry.
Local and foreign developers must register with ZiCMA. You must show that you have the money and the skills, work to a recognised crediting standard, and have a clean record. Credits issued after 18 August 2023 cannot be sold unless they are recorded in the Registry. That is why older projects were given a transition route while their papers were put in order.
The regulations are long. They have sixteen schedules on fees, templates, integrity, safeguards and community benefit. For an engineer or an investor, three things matter most: what is deducted from every credit, the stages of registration, and the integrity tests.
What comes off every credit
This is the most important number in the rules, and it is often reported wrongly. The deductions are taken from the credits themselves, not from your sales income, at the moment the credits are issued. Section 12 and the Eighth Schedule say this: 30% of the credits go to the government as its Share of Proceeds. Another 2% go into a national reserve, called the buffer account, to cover any mistakes or reversals. And 1% is retired straight away to count toward Zimbabwe's national climate pledge. What is left is 67% of the credits, and that goes to the project owner's account.
The effect on your numbers is direct. A project that verifies 100,000 tonnes in a year receives 67,000 credits it can sell, not 100,000, before fees. The reserve credits cannot be sold or moved. They are cancelled only to cover a confirmed reversal. The Seventh Schedule also sets fees for registry accounts, submitting the design document, registration, issuing credits and transfers, and the registration fee rises with the size of the project. Put these in your cash flow as well. A revenue model that ignores the deductions overstates your income by about a third.
- National Transaction Account (Share of Proceeds)30%
- National Buffer Account2%
- Retired toward the NDC1%
Per section 12 and the Eighth Schedule of the gazetted regulations. Percentages apply to the volume of credits, not to revenue. The 67% is what remains after the three deductions. Source: SI 48 of 2025, gazetted text
Registration, stage by stage
Registration happens in stages, and each stage has a clear output. If you know them, you can plan your technical work around the calendar.
- Register as a developer and submit a Project Idea Note. This short document describes the project, where it is, the credits you expect, the environmental risks and the benefits to people. Fees apply when you submit.
- Classification and Letter of No Objection. ZiCMA sorts the project by size. Category A is more than 15 million credits over the project's life, or more than 300,000 hectares. Category B is between 1 and 15 million credits. Category C is anything smaller. Within 30 days it sends you either a Letter of No Objection or a Letter of Objection.
- Project Design Document. After a no-objection letter you have 18 months to prepare this document. It holds the baseline (what would have happened without the project), the proof that the project would not have gone ahead without carbon money, the monitoring plan, and the plan for community benefits.
- Certificate of Registration. If ZiCMA accepts the document, it issues a certificate valid for up to 15 years, and it can be renewed. You must start work within 180 days of the date on the certificate, and tell ZiCMA within 14 working days that you have started.
- Verification and issuing of credits. A licensed independent auditor checks the emission cuts. Then you ask for the credits to be issued. ZiCMA takes its deductions and puts the rest in your account.
Where a recognised crediting standard issues the credits, that standard's certificate is linked to each credit on the Registry. So you do the technical work once, to a standard that both the regulator and the buyers accept.
What the integrity rules ask for
The Fifth Schedule sets the rules on integrity, and engineers should read it first because it controls the calculation. Credits must be real, checkable and additional. Additional means the cut would not have happened without carbon money. You must set your baseline cautiously, below the usual business-as-usual forecast. You must use methods approved under a reputable crediting standard, and you must count any emissions that simply move elsewhere, called leakage.
The rules also deal with permanence, meaning that the saving must last. The standard period is 30 years. If a large reversal happens, one that affects more than 5% of the previous year's credits, you must report it within 14 days. A licensed auditor checks the affected amount at your cost, and that amount is cancelled or held back from future credits.
Two rules stop double counting. ZiCMA will not approve two projects of the same type in the same area. Different types in one area are allowed only after a case-by-case review. You must also show that you have the legal right to work on the land, so land title and community consent are at the centre of the application. Some areas can be declared closed to carbon projects if a project there would harm the country's own climate target.
Community and safeguard conditions
The community rules are specific. Your investment plan must show that at least 20% of the total investment goes straight to local communities. That can be jobs and training, public infrastructure, education, health and sanitation, food security, clean water or clean energy. At least half of that community money must go to sustainable energy and safe drinking water. If you cannot show these benefits, the project is refused. You must file a Sustainable Development Report within 12 months of starting.
Tree-planting projects must put at least 30% of the replanted area under native plants. Every project must submit a form on environmental harm and comply with the Environmental Management Agency (EMA). Clean-cookstove projects are treated as high risk. Tier 2 stoves and lower are not allowed. Tier 3 stoves are allowed only if they are in place by the end of 2026, with one project per ward.
Which projects fit
- Renewable energy: solar and hydro that replace grid or diesel power. The saving is worked out from the grid or diesel baseline and the energy delivered, so it rests on metered data.
- Energy efficiency: factory upgrades with measured savings, usually proven under the IPMVP (the international method for measuring savings).
- Forestry and clean cooking: these can earn large volumes, but they face the strictest rules on land rights, community benefit and safeguards.
Energy projects suit engineering firms best, because the saving is a calculation from meters, not a guess from satellite pictures. Small developers can also keep a baseline they can defend with energy projects.
Where projects stall
Reports in 2026 say the sector is still finding its feet. NewsDay reported that only a handful of projects were fully registered, and that a Climate Change Act was still before Parliament. Other reports give much bigger numbers of projects approved at an early stage. That is a reminder that approved and fully registered are not the same thing. The delays have the same causes again and again:
- Revenue models that assume 100% of the verified credits reach the developer, when 33% is taken at issue.
- Weak metering, so the cuts cannot be verified later.
- Arguments with communities over land or benefit sharing. The 20% rule means you must settle these early.
- Waiting for the market to settle, instead of preparing the baseline and monitoring plan while the Project Idea Note is being reviewed.
The lesson is to use the 18-month design window well. A complete file shortens the back-and-forth of questions with ZiCMA and the auditor.
How AVEX GRID helps
- Baseline and calculation for solar, efficiency and fuel-switch projects, using the cautious approach the rules ask for.
- Monitoring design, with meter specifications and data rules the auditor can verify.
- Readiness review of your documents against what ZiCMA and the crediting standards ask for.
- Cash-flow check that applies the 33% deductions and the fees before a lender sees your model.
- Link to the engineering file that lenders and regulators read.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
Can a solar plant earn carbon credits in Zimbabwe?
In principle yes, if it meets the baseline, additionality and monitoring tests and registers with ZiCMA. Whether a specific project qualifies depends on its details.
How much of the credits does the government take?
Under SI 48 of 2025, 30% of the credits issued go to the National Transaction Account as the Share of Proceeds, 2% go to the buffer account and 1% is retired toward the NDC. The proponent receives 67%. These are shares of credits, not of revenue.
How long does registration take?
ZiCMA must answer a Project Idea Note within 30 days with a Letter of No Objection or Objection. The developer then has up to 18 months to submit the Project Design Document. Reports suggest slow progress so far, so we cannot promise a timeline.
How long is a registration valid?
A Certificate of Registration is valid for a specified period of up to 15 years and can be renewed on payment of fees. Implementation must start within 180 days of the certificate date.
Do you broker credits?
No. We prepare the engineering and measurement work that supports registration.
Sources and notes
General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.
- SI 48 of 2025: Carbon Trading (General) Regulations, 2025 (gazetted text, Veritas)
- Afriwise: New regulatory framework for carbon trading in Zimbabwe (SI 48 of 2025)
- ESG Network Zimbabwe: New regulations for carbon credit trading
- NewsDay: Carbon cash delay, Zim fails to unlock green billions
- The Herald: Zim sets up carbon credit market regulatory framework