Technician fixing a solar panel on a rooftop
Solar7 November 2026·9 min read

Solar for business in Zimbabwe: own-consumption licences, net metering and when it pays

Solar on your roof is now a normal business decision in Zimbabwe. Doing it well means the right size, the right registration and a clear idea of the savings.

In this article
  1. Own-consumption or net metering: what is the difference?
  2. The 2026 rules, size by size
  3. What else changed in July 2026
  4. What the registration numbers say
  5. Does solar pay? The method
  6. Who benefits most
  7. Ten checks before you sign a solar contract
  8. A realistic programme for a 500 kW plant
  9. Five mistakes that delay a plant
  10. The paperwork in outline

Key points

  • Since July 2026 (SI 126), own-use plants from 100 kW to 10 MW register with ZERA before construction. The fee is US$10, excluding VAT.
  • Net metering lets you send extra power to the grid. About 73.7 MW is registered from roughly 814 sites, against a 100 MW target.
  • Solar pays best where you use lots of power in the daytime: factories, cold rooms, hotels, schools, shops and irrigation.
  • Size the system to your load and tariff, not to your roof. Oversizing and ignoring the demand charge are the two common mistakes.
  • Be ready for paperwork: a single-line diagram, equipment data, ZETDC connection approval and ZERA registration or licence.
中文摘要 · CHINESE SUMMARY

津巴布韦企业光伏:自用发电许可、净计量及经济性

  • 企业可依据ZERA规则发电自用。据报道,ZERA在2025年批准了61份发电许可证,其中许多为自用光伏。
  • 根据2026年第126号法令:自用发电站容量在100千瓦至10兆瓦之间的,须在建设前向ZERA登记(表格GFOC1,附并网影响评估报告、公司注册文件、土地使用证明及环评或豁免函,登记费10美元,不含增值税);10兆瓦以上须取得发电许可证。
  • 根据2018年条例,净计量允许并网用户向电网输送多余电量。据报道,截至2025年底约814个站点、约73.7兆瓦已登记,目标为100兆瓦。
  • 光伏在白天负荷高的场所最划算:工厂、冷库、酒店、学校、商场和灌溉。
  • 应按负荷和电价来确定容量,而不是按屋顶面积。容量过大和忽视需量电费是最常见的两个错误。
  • 需要准备的文件:单线图、设备资料、ZETDC并网批准,以及ZERA登记或许可。
  • AVEX GRID 可提供容量测算、并网研究和申报技术文件(英文沟通)。

联系方式:WhatsApp +7 900 131 7406,邮箱 inquiries@avexgrid.com。

With long load-shedding hours and tariffs that reflect the true cost of power, more Zimbabwean businesses are putting solar on roofs, car parks and open land. The technology is not the hard part. The hard part is choosing a size that matches your load, designing a safe connection and getting the approvals. This guide explains the route and the economics in plain language. It is for owners and managers of factories, hotels, farms, schools, shopping centres and offices.

Own-consumption or net metering: what is the difference?

Own-consumption generationNet metering
IdeaYou generate mainly for your own use, on site or through a private arrangementYou stay connected to the grid and can send extra power to ZETDC's network
Typical userIndustrial and mining sites, large commercial usersBusinesses, schools, hotels and homes with rooftop solar
ApprovalsZERA registration before construction for 100 kW to 10 MW (SI 126 of 2026); a licence above 10 MWApplication to ZETDC and ZERA under the Net Metering Regulations (2018)
Watch-pointsA grid impact study if connected; protection and control of power flowing back into the gridThe meter arrangement; limits on system size compared with your connection

The rules changed in 2026. Statutory Instrument (SI) 126 of 2026 sets out how own-consumption plants are registered or licensed, depending on size. The next section explains it in full. Before you buy, we confirm the current requirements with ZERA.

The 2026 rules, size by size

SI 126 of 2026 is called the Electricity (Own Consumption Undertakings Licensing Capacity) Regulations. It applies to power stations that make electricity for their own use. It defines own consumption as using the electricity from a station owned by the same entity. The core of the rule is a ladder by size:

Size of the plantWhat the regulations require
Under 100 kWSI 126 does not require registration. A system connected to the grid follows the net-metering rules and the utility's connection requirements
100 kW to 10 MWRegister the plant with ZERA before construction on Form GFOC1. When construction is complete, file a notice on Form GFOC2 with the commissioning certificate
Above 10 MWA generation licence from ZERA

The registration file for the middle band has four attachments and one fee. The attachments are a grid impact assessment report, company registration documents, proof that you can use the land, and an environmental impact assessment or an exemption letter from the Environmental Management Agency (EMA). The registration fee is US$10, excluding VAT. ZERA then publishes a quarterly notice in a national newspaper listing the registered stations. It also keeps a register of registered and operating projects. The technical rules for connection, operation and maintenance follow the existing laws.

100 kWthe size at which registration before construction starts
10 MWthe size above which you need a full licence
US$10registration fee, excluding VAT, for plants between the two
The fee ladder for solarUS dollars, by size and instrument
Registration, own-consumption plant of 100 kW to 10 MW (SI 126)
US$10
Application fee, commercial renewable up to 10 MW (SI 125, as summarised)
US$20
Fixed licence fee, solar above 10 MW (SI 125, as summarised)
US$2,875

The US$10 fee excludes VAT. The SI 125 figures come from a ZELA summary, so check the instrument. Source: SI 126 of 2026; ZELA

The grid impact assessment takes the longestThe registration file needs an assessment done by the grid operator, so the timetable depends on someone else. Ask for it first, before you order equipment. Form GFOC1 also asks for the nameplate capacity, any battery storage in MWh, the EPC company, how you will fund the plant, and its expected life and upgrades. So you must make those decisions before you can fill in the form.

What else changed in July 2026

The Zimbabwe Environmental Law Association published a summary of the regulations gazetted on 31 July 2026. It describes two more changes that matter to a solar owner. We have not checked the regulations themselves, so treat these as pointers.

  • Net metering was changed again (SI 127). The summary describes virtual net metering across linked sites. It says the distributor must decide within 21 days. It also describes a yearly payment for the net extra power you export, at a rate ZERA will set.
  • Licence fees were changed (SI 125). The summary says that renewable plants for your own use, of any size, pay no licence fee. It says commercial renewable plants up to 10 MW pay an application fee of US$20. Fixed fees for solar above 10 MW start at US$2,875.

These two regulations deal with different things from SI 126, which covers the registration of plants for your own use. Read each one for the case you have in mind. For a developer's wider view of the new rules, see SI 122 in ten steps and investing in Zimbabwe's energy sector.

What the registration numbers say

At the end of 2025, ZERA reported about 73.7 MW registered under net metering from roughly 814 sites. The target is 100 MW. That is an average of about 91 kW a site. The typical registered system is a commercial roof of around 100 kW. That is also the size where SI 126 begins. So the new rule serves the next step up, from 100 kW, above the market that has dominated until now.

73.7 MWregistered under net metering at the end of 2025
~814sites, an average of about 91 kW each
135net-metering applications reported pending at the end of 2025

Does solar pay? The method

A fair answer comes from three numbers. First, what the plant produces. Second, what each unit of its output is worth to you. Third, what it costs installed.

  • Production. In most of Zimbabwe, a well-designed system makes roughly 1,600 to 1,800 kWh per kWp per year. So a 100 kWp plant makes about 160,000 to 180,000 kWh a year.
  • Value per unit. For a business, each solar kWh replaces a kWh you would have bought from ZETDC or made with diesel. Industrial rates have averaged about US 10 to 14 cents per kWh. They are higher at peak times and far higher for diesel power.
  • Yearly value in the example. A 100 kWp plant making 170,000 kWh a year, valued at US 10 to 14 cents, saves you about US$17,000 to US$24,000 a year in energy cost. Compare that with an installed-cost quotation to see the payback.
Do not forget the demand chargeSolar reliably cuts your energy cost. But it lowers the maximum-demand charge only if your peak happens when the sun is up. A cloud at the wrong moment can still set the peak. Batteries or load control close that gap. Our tariff guide explains how.
Own-consumption solar registered with ZERAMegawatts, end of 2025
73.7 MWRegistered, as a share of the 100 MW target

Source: ZERA

Who benefits most

  • Factories and agro-processors with day shifts, cold rooms and compressors.
  • Hotels, lodges and hospitals with steady loads that need backup.
  • Farms with irrigation pumps that run in the day.
  • Schools and shopping centres with large roofs and people in the building by day.
  • Telecom and data sites where hybrid power replaces hours of diesel.

Ten checks before you sign a solar contract

  1. The system is sized on your measured load profile, not on the biggest roof area.
  2. The quotation names the panels, inverters and mounting, with datasheets and warranties.
  3. Protection is specified: anti-islanding (switching off when the grid fails), control of power flowing back into the grid, and earthing, with a single-line diagram.
  4. The designer has checked the effect on your supply: voltage, fault current and harmonics.
  5. Batteries, if included, are sized for a stated purpose: backup, peak shaving or both.
  6. The installer will handle the ZETDC and ZERA paperwork, or you know who will.
  7. Performance is defined: the expected kWh per year, how it is measured and what happens if it is missed.
  8. Monitoring is included, so you can compare production with the model.
  9. The contract states the commissioning tests and the handover documents.
  10. An independent engineer has reviewed the design, if the system is large.

A realistic programme for a 500 kW plant

StageWhat happensWho controls the clock
1. Study and designLoad profile, sizing, single-line diagram and economicsYou and your engineer
2. Grid impact assessmentYou request it from the grid operator, who does the assessmentThe grid operator
3. Environmental stepAn environmental impact assessment or an exemption letter from EMAEMA
4. Registration before constructionForm GFOC1 with four attachments and the feeZERA
5. Procurement and constructionOnly after registrationYour contractor
6. CommissioningTests and a certificate, then Form GFOC2You, the contractor and the utility

The order matters. Registration comes before construction. A plant built first is exposed to risk. An owner's engineer keeps the paperwork and the contractor's programme in step. See what an owner's engineer does.

Five mistakes that delay a plant

  • Ordering equipment before you file the registration, in a size band where registration comes before construction.
  • Leaving the grid impact assessment until last, when it is the item that depends on someone else.
  • Sizing the plant on the roof, not on the load and the tariff.
  • Forgetting the effect of the power factor and the harmonics from the inverters on your existing supply.
  • Assuming the rule for a small net-metered roof applies to a larger own-use plant, or the other way round.

Each of these is cheaper to avoid than to fix. A short design review before you spend any money finds most of them.

The paperwork in outline

  1. Design and single-line diagram showing the generation, protection and metering.
  2. Equipment data and certificates for the panels, inverters and protection devices.
  3. Application to ZETDC for connection and, where it applies, net metering.
  4. ZERA registration (Form GFOC1) before construction for 100 kW to 10 MW, or a licence above 10 MW. Then Form GFOC2 with the commissioning certificate before the plant operates.
  5. Inspection, commissioning and approval to operate.

ZETDC and ZERA take time to process applications. Reports at the end of 2025 mentioned 135 net-metering applications still waiting. A complete, correct file avoids the longest delays.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

Can I build first and register afterwards?

No. SI 126 says a plant of 100 kW to 10 MW must be registered with ZERA before construction. You must also file a notice with the commissioning certificate before it operates.

What do I need to attach to the registration form?

A grid impact assessment report, company registration documents, proof that you can use the land, and an environmental impact assessment or an exemption letter from the Environmental Management Agency. Add the US$10 fee, excluding VAT.

Who does the grid impact assessment?

The regulations say the grid operator does it. Request it early, because you cannot complete the registration without it.

Do I need a licence for rooftop solar in Zimbabwe?

It depends on size. Under SI 126 of 2026, a plant for your own use above 10 MW needs a ZERA licence. A plant between 100 kW and 10 MW must be registered with ZERA before construction. Smaller grid-connected systems follow the net-metering rules. AVEX GRID confirms the route for your project as part of the scope.

What is net metering?

It lets a customer who is connected to the grid and makes power on site send the extra energy to the utility network. It is covered by the Electricity (Net Metering) Regulations, 2018.

Will solar remove my power cuts?

Not by itself. A grid-tied system switches off when the grid fails, for safety. To keep running during power cuts you need batteries or a hybrid inverter designed for it.

How big should my system be?

Size it to your daytime load and tariff. A system that is too big wastes money, unless you can export and be credited for the extra power.

Topics: solar for business Zimbabwenet metering ZimbabweZERA net metering registrationown-consumption solar licencecommercial solar Zimbabwesolar for hotels and farms Zimbabweenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Is solar worth it for your site?

Send us a recent bill and a photo of your roof or site. We tell you the right size, the likely saving and what the registration involves, before you buy anything.

+263 78 488 9775 · Autherstone Street 21, Marondera, Zimbabwe · Remote across Southern Africa