Thermal imaging for electrical faults: what it finds and how to act on it
A loose connection or an overloaded cable gets hot before it fails. A thermal camera shows the heat while the plant is running, so repairs can be planned.
In this article
Key points
- Electrical faults often produce heat long before they cause an outage. A thermal survey finds them while the plant is still in service.
- A good survey is done under load. A connection that is cool at light load can be hot at full load.
- Findings are ranked by the temperature rise over a reference, the load at the time and the criticality of the equipment.
- Typical findings are loose or oxidised connections, unbalanced phases, overloaded cables and failing breakers or fuses.
- Surveys are repeated on a schedule, so that new problems are found early and repairs are proved by a second image.
Heat is the most common early sign of an electrical fault. A connection with extra resistance turns part of the current into heat. The effect grows with the square of the current. So a joint that is only slightly warm at light load may be dangerous at full load. Thermal imaging measures that heat without touching the equipment.
How a survey works
- Plan. List the equipment: switchboards, motor control centres, transformers, bus bars, disconnects, large motors and critical circuits.
- Choose the conditions. The plant should run at a typical load, ideally more than half of its normal maximum. Write down the load during the survey.
- Scan. Covers are removed where it is safe, or the camera looks through inspection windows. The camera records images of each part and its surroundings.
- Compare. The thermographer is a trained person who takes and reads thermal camera images. The thermographer compares like with like, such as the three phases of the same connection. The thermographer also notes how many degrees hotter the part is than a reference.
- Report. Each finding is recorded with a thermal image and a normal photo. The report gives the measured temperature rise, the load and a recommended action.
What it finds
| Finding | Typical cause |
|---|---|
| One hot connection among three phases | Loose or oxidised joint on that phase |
| Uniformly warm conductor | Overloaded cable or undersized conductor |
| Hot fuse or breaker | Poor contact, ageing or overload |
| Warm transformer connection or bushing | Loose terminal or internal problem |
| Hot bearing or motor housing | Mechanical wear, misalignment or lubrication fault |
Reading the severity
Severity depends on three things: how far the temperature is above a reference, the load at the time, and what a failure would cost you. A small rise on a non-critical circuit can wait for the next planned outage. A large rise on a main incomer or a critical process needs action soon.
The ISO 18434 series of standards describes how to judge severity. ISO is the International Organization for Standardization, which writes international standards. The series covers thermography, overloads or failing equipment. Many sites also set their own priority bands in the maintenance plan.
Bars show the upper limit of each band. A common industry guide; limits depend on the standard and the load at the time. Source: NETA maintenance testing specifications
Limits of the method
- It sees surface temperature. Equipment behind closed panels needs inspection windows or safe access with covers off.
- Shiny surfaces reflect heat and can mislead. A trained thermographer allows for this.
- It only shows faults that produce heat. Other faults need other tests, such as insulation testing or power-quality measurement.
Why it pays
Survey frequency
Many sites survey critical electrical equipment once or twice a year, and other equipment once a year. Some plants should survey more often. These are plants with heavy loads, vibration, dust or heat, and plants that have had failures before. The right frequency follows the risk, so agree it with your maintenance team.
What a good thermal survey records
A thermal image on its own proves little. The value of a survey lies in the conditions and the comparisons that go with each image.
- Load at the time. A connection that is sound at light load can run hot at full load. A survey is most useful when the equipment carries a normal working load. Write down the load at the time of each image.
- A comparison, not just a number. The temperature of one phase is compared with the other phases, or with an identical part carrying the same current. A rise above the comparison matters more than the temperature itself.
- The camera settings. Emissivity and reflected temperature affect the reading, especially on shiny metal. A careful survey records the settings used, so another engineer can repeat it.
- A normal photograph of the same part, so you can find the finding again months later.
- A ranking of findings. Findings are normally placed in bands by temperature rise. The bands run from "monitor", through "repair at the next planned outage", to "repair as soon as it is safe". Agree the bands with the client before the survey.
From finding to repair
Most hot spots come from loose, dirty or corroded connections, and from unbalanced or overloaded circuits. The fix is usually simple. Clean and re-tighten the connection, replace a worn part, or rebalance the load. What matters is that the repair is done safely, recorded, and checked with a second image afterwards. A survey that ends with a list and no follow-up image leaves one question open: is the fault really gone?
How AVEX GRID helps
- Thermal surveys of switchboards, motor control centres, transformers and critical circuits.
- Ranked findings with images, loads and recommended actions.
- Follow-up checks and links to protection and power-quality studies, so that the root cause is fixed.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
Does the plant need to shut down for a survey?
No. A survey is done while the plant is running under load. Some panels need covers removed, which is done with the site's safety procedures.
How long does a survey take?
It depends on the number of panels and their access. Most single-site surveys take a day or two.
Can thermal imaging find all electrical faults?
No. It finds faults that produce heat. It is one tool alongside insulation testing, protection testing and power-quality measurement.
What should I do with the findings?
Rank them by severity and criticality, plan repairs for the next suitable outage, and repeat the survey to confirm that each repair worked.
Sources and notes
General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.