Banks and financial branches: keeping power on and the energy bill down
A bank branch that loses power loses customers and trust. Start with the few services that must never stop, then build the power design around them.
In this article
Key points
- The critical loads are small in power but big in consequence: core systems, network, ATMs, security and server-room cooling.
- The standard protection is a UPS to carry the critical loads without a break and a generator with automatic transfer for longer outages.
- A UPS keeps equipment running but not cool. Cooling for the server room needs its own backup.
- Branch networks gain from a single standard design, because specification, maintenance and testing can be repeated across sites.
- Rooftop solar suits a branch that trades in daylight, and it lowers the bill without touching the protected supply.
A bank branch is a small installation, but the cost of it going down is very high. Its load is modest. It is usually a few tens of kVA, for air conditioning, lights, computers and security. But a lot of value depends on that load: customer transactions, cash handling and the trust a bank must earn every day. So the job is not to supply a lot of power. The job is to supply a small amount of power very reliably. And you must do it at a cost you can repeat across a whole network of branches.
Start with the services, not the equipment
Start with a conversation between the electrical engineer and the bank's operations and risk teams. Ask which services must keep running during a power cut, and for how long. Four groups of loads appear in almost every branch.
The first group is the core systems that process transactions. These are the teller terminals, the branch server, and the printers and card readers connected to them. The second group is the network. A branch without communications is cut off from head office, however well its own equipment is powered. The third group is the ATMs (the cash machines) and cash services that customers expect to use outside trading hours. The fourth group is security: alarms, access control, CCTV, and the lighting at vaults and entrances. Cooling for the server room is a fifth group that people often forget. We cover it below.
Each group can tolerate a different gap. Transaction systems and servers usually cannot tolerate any break. If power fails in the middle of a transaction, the records can be left inconsistent. Network equipment can tolerate a short gap, but only if it restarts reliably. Lighting and comfort air conditioning can usually wait for seconds or minutes. This sorting decides three things. It decides what must sit on a UPS. It decides what the generator can carry alone. And it decides what you can drop when capacity runs short.
Each extra nine cuts permitted downtime tenfold and adds redundancy and cost. Source: AVEX GRID calculation: 525,600 minutes a year multiplied by (1 minus availability).
Layering the backup
The standard design has three layers.
The first layer is the UPS with batteries. It carries the critical loads with no break and protects them from sags and surges on the grid. Size its batteries for the time the generator needs to start, settle and take the load. Add some allowance for the batteries ageing over their life.
The second layer is a generator. It has an automatic transfer switch, which moves the supply from the grid to the generator by itself when the power fails. It also needs enough fuel for the longest outage the branch design assumes. The generator takes over for longer outages.
The third layer is a split of the distribution board into essential and non-essential circuits. Then, if the generator or batteries are limited, you can switch off the non-essential loads. These are things like general lighting and comfort cooling in public areas.
The whole system is only as reliable as its weakest part. Branch audits often find a UPS with expired batteries, a generator that has not run for six months, or a transfer switch that has never been tested. So keep a schedule of tests under load, with records. That turns equipment on a drawing into availability, that the bank can rely on.
Do not forget the cooling
A UPS protects the electrical supply of the equipment. It does nothing for the temperature of the room. Servers and network equipment give off heat all the time. If cooling stops, they can reach damaging temperatures within a short time, even while they are still powered. So put the server room cooling on the essential board with the generator. Then check that the cooling units restart by themselves after a transfer. They must restart in the right order and without tripping the generator. Many branch failures that people blame on power are really caused by overheating in an unventilated room after a power cut.
Design for the whole network
A bank with dozens of branches gains more from keeping things the same than from tuning each site. Prepare one standard design for each branch size, such as small, medium and large. Each design specifies the UPS, generator, transfer switch and distribution, with a scope of work and a standard test procedure.
This brings several benefits. Design costs fall and installation is faster. Spares and maintenance contracts are simpler. And the bank gets performance data it can compare across the network. The site-specific work is then small. You only confirm the load, the supply capacity and the physical layout. The cheapest way to start is usually to audit a sample of branches and then prepare the standard design.
Lowering the bill with rooftop solar
A branch trades during the day. Its air conditioning also works hardest in the hottest hours. That matches the output of a photovoltaic array, the technology in solar panels that turns sunlight into electricity. Rooftop solar supplies much of the daytime load and lowers your grid bill.
With a hybrid inverter and a battery, the same equipment can also support the essential loads during a power cut. An inverter is the device that changes the direct current from the panels or batteries into the alternating current your equipment uses. The design must be done carefully. The solar controls must work together with the generator and must not feed power back into it. Decide on solar on the same economic basis as for any commercial building, as our guide on solar feasibility explains. For a bank you also get the extra benefit of resilience.
Testing, inspection and records
Three routines keep the system reliable.
First, run the generator on load at set intervals. Do not just start it. Record the transfer time, voltage and frequency each time. Second, test how long the UPS can run and replace the batteries on schedule, because battery capacity falls with age and heat. Third, scan the switchboards, connections and battery terminals each year with a thermal camera. It finds loose or overloaded connections before they fail. Our article on thermal imaging explains what a survey finds.
The records are useful beyond maintenance. They support your internal risk reviews. They also support the assurance that regulators and auditors expect more and more from financial institutions.
How AVEX GRID helps
- Branch power assessment. We map the critical loads and check the UPS, generator, transfer and cooling against them.
- Standard design for a rollout. We prepare one specification and a costed plan for each branch size across your network.
- Solar and efficiency. We size rooftop solar and quantify the savings per branch.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
How long should a branch run on backup?
It depends on the outage pattern of the area. The design sets the generator fuel and the UPS autonomy to that pattern.
Can solar keep a branch open during an outage?
With a hybrid inverter and a battery, solar can carry critical loads. A generator remains the backup for long outages.
What is the quickest improvement?
Put the server room cooling on the essential board and test the transfer under load.
Can one design serve many branches?
Yes. A standard design by branch size, with site-specific confirmation, keeps cost and maintenance simple.
Sources and notes
General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.