Press & media kit

Everything a journalist or partner needs about AVEX GRID.

Logos, boilerplate descriptions, founder bio, headshots, and brand-colour reference. All freely usable in articles, slide decks, panel programmes, conference materials, and tender annexes.

01 Logos

Three approved logo lockups.

Right-click any logo to save. Use the lockup that fits your medium — full version for print, compact for screen, icon for favicons and avatars.

AVEX GRID full logo with energy consultancy tagline

Full logo

1536×1024 PNG, transparent. For letterheads, slide deck title pages, large-format print.

Download PNG →
AVEX GRID compact horizontal logo

Compact lockup

727×168 PNG, transparent. For headers, email signatures, social profiles.

Download PNG →
AVEX GRID diamond mark icon

Diamond mark

512×512 PNG, transparent. For favicons, app icons, social-media avatars, podcast art.

Download PNG →
02 Brand colours

Three primary, two supporting.

Navy ink

#0E1A2B

Brand red

#E11D2A

Paper

#FBFAF6

Electric blue

#0F4FBE

Highlight

#FF6477

03 Boilerplate

Copy-paste descriptions for any context.

1-sentence

AVEX GRID is an independent Zimbabwean electrical engineering and energy consultancy serving mines, mills, IPPs and large commercial operators.

25-word version

AVEX GRID is a ZERA-registered Zimbabwean electrical engineering and energy consultancy. We deliver ETAP-modelled studies, NEEP-compliant audits, and bankable feasibility packs for industrial and IPP clients.

Full boilerplate

AVEX GRID is an independent Zimbabwean electrical engineering and energy consultancy, founded in 2025 and based in Marondera. The practice delivers ETAP-modelled electrical studies (load flow, short circuit, protection coordination, arc flash), investment-grade energy audits compliant with the National Energy Efficiency Policy 2025, bankable feasibility studies for captive solar and Independent Power Producer registration, and grid-code compliance work for ZETDC interconnections. The founder is a ZIE Graduate Member and ZERA-registered consultant.

04 Founder bio

Short, long, and "panel programme" formats.

Short — for panel programmes

Devine Tafara Javangwe is the founder of AVEX GRID Energy Consultancy. ZIE Graduate Member, ZERA-registered consulting engineer, ETAP-trained since 2021.

Long — for articles & profiles

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID Energy Consultancy. He holds a BEng in Electrical Engineering and authored a 118-page MSc dissertation on industrial load-flow and power-quality forensics for Zimbabwean grid conditions. He is a Graduate Member of the Zimbabwe Institution of Engineers (ZIE20265434), a ZERA-registered consultant, ETAP-trained since 2021, and conversant in IPMVP measurement and verification methodology. Devine’s focus is on practical engineering work for Zimbabwean industry — audits, ETAP studies, captive-solar feasibility, and grid-code compliance — delivered to international standards but priced for the local market.

05 Press contact

Get in touch.

For interviews, panel invitations, expert-commentary requests, or company-profile materials, email the press contact directly. Same-day turnaround on most requests.

Devine Tafara Javangwe · Founder

press@avexgrid.com · +263 78 488 9775

Want the Company Profile?

A 30+ page PDF covering credentials, services, sectors, engagement model, and the founder bio. Free, lightly gated.